title: Data centre design for COLO-D
date: 2021-03-12T14:59:00-05:00
author: jessica napert
canonical_url: "https://www.bbaconsultants.com/en-ca/projects/data-centre-design-for-colo-d"
section: Projects
---
Colo-D is a North American leader in colocation data centre solutions. In fact, by adding its second data centre in the greater metropolitan region of Montréal in 2016, it became the largest provider of colocation services in Québec.

 

- Region Eastern Canada
- Client  COLO-D
 
 

 

 

   1. ## Our experts' solutions
    
    In 2014, BBA participated in building and expanding COLO-D’s first 20 MW data centre in Drummondville. The company mandated BBA again to perform the electrical design of their second data centre, with a 35 MW capacity, in Longueuil. In both instances, BBA’s mandate included designing and commissioning the centre’s 25 kV input, the critical low-voltage supply system, emergency generators and uninterruptible power supply (UPS) units.
    
    
    - TIER III (Uptime Institute) data centre design
    - Cutting-edge expertise in electrical design as well as critical networks and redundancy
    - Met tight deadlines, despite project complexity and high technical requirements
 
   

  

 

 1. > BBA has accredited experts in data centre design, which lends great credibility in the market.
    
     Yves Bétournay, ATD
2. - 55 MW combined capacity
    - 300,000 Total area of 300,000 square feet
    - Second largest colocation data centre provider in Canada
 
   - [  17 Aug 2026 
    
     Marc-André Langlais appointed Chief Technology Officer 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/news/marc-andre-langlais-appointed-chief-technology-officer "Marc-André Langlais appointed Chief Technology Officer")
- [  17 Aug 2026 
    
     Structural engineering early phase: unlocking value through early decisions 
    
     
    
     
    
    
    - ![Nicolas Samson](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/197852/Nicolas-Samson.webp)   
        
         Nicolas Samson, P.Eng.
        
        Senior Engineer, Structure
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/structural-engineering-early-phase-unlocking-value-through-early-decisions "Structural engineering early phase: unlocking value through early decisions")
- [  12 Aug 2026 
    
     Four mistakes that can harm the future performance of industrial assets 
    
     
    
     
    
    
    - ![Caroline provost](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/208557/Caroline-provost.webp)   
        
         Caroline Provost P.Eng.
        
        Director, Operational Strategy Implementation
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/four-mistakes-that-can-harm-the-future-performance-of-industrial-assets "Four mistakes that can harm the future performance of industrial assets")
- [  29 Jul 2026 
    
     Sachin Jari appointed Principal Director &amp; Head of Commercial Strategy and Business Development 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/news/sachin-jari-appointed-principal-director-head-of-commercial-strategy-and-business-development "Sachin Jari appointed Principal Director & Head of Commercial Strategy and Business Development")
 
 

       

 

 

   

 Let’s see what  
we can do  
together [ Contact us    

 ](https://www.bbaconsultants.com/en-ca/contact) 

 

   

 1. ## Our experts' solutions
    
    In 2014, BBA participated in building and expanding COLO-D’s first 20 MW data centre in Drummondville. The company mandated BBA again to perform the electrical design of their second data centre, with a 35 MW capacity, in Longueuil. In both instances, BBA’s mandate included designing and commissioning the centre’s 25 kV input, the critical low-voltage supply system, emergency generators and uninterruptible power supply (UPS) units.
    
    
    - TIER III (Uptime Institute) data centre design
    - Cutting-edge expertise in electrical design as well as critical networks and redundancy
    - Met tight deadlines, despite project complexity and high technical requirements