BBA was involved in a CO2 capture demonstration project of 30 tonnes per day with Svante at the Husky Energy industrial gas boiler plant in Lashburn, Saskatchewan, Canada.  
  
Svante (formerly Inventys Thermal Technologies) offers companies in emissions-intensive industries a commercially viable way to capture large-scale CO2 emissions from existing infrastructure, either for safe storage or to be recycled for further industrial use in a closed loop. With the ability to capture CO2 directly from industrial sources at less than half the capital cost of existing solutions, Svante makes industrial-scale carbon capture a reality. It is a rapid cycle temperature swing adsorption (TSA) based process with a proprietary intensified process cycle, novel structured adsorbent filters and low-cost continuous rotating adsorption equipment.

 

- Region Western Canada
- Client  Svante
 
 

 

 

   1. ## Our experts' solutions
    
    BBA’s experience in construction, site supervision and project management helped prioritize deliverables to meet a very demanding project schedule.
    
    
    - Electrical and automation detailed engineering for over 300 instruments
    - Electrical equipment specifications
    - Control philosophy
    - Construction support
    - Commissioning
    - Structural review and design
    - Review of hazardous zones classification
    - Arc-flash studies
    - Factory acceptance testing (FAT)
 
        

  

  

 

 1. > BBA is a world-class EPCM organization. The team assigned to our project was very professional and provided innovative solutions.
    
     Claude Létourneau, President &amp; CEO, Svante
2. - 200,000 One Svante commercial-scale installation can remove the equivalent CO2 of 200,000 cars per year doing the same job of 10 million trees
    - 80% reduction target in Canadian GHG emissions by 2030
    - 704 Mt of CO2 produced in 2016 in Canada
 
   - [  01 Oct 2026 Power and Renewables  
    
     
    
     Reliable power starts with the right grid interconnection strategy 
    
     
    
     
    
    
    - ![Jeremie Cote](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206702/Jeremie-Cote.webp)
    - ![Alizera Khosroshahi](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/216932/Alizera-Khosroshahi.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/reliable-power-starts-with-the-right-grid-interconnection-strategy "Reliable power starts with the right grid interconnection strategy")
- [  25 Sep 2026 
    
     Todd Farrell appointed Director, Chemicals 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/news/todd-farrell-appointed-director-chemicals "Todd Farrell appointed Director, Chemicals")
- [  23 Sep 2026 Power and Renewables  
    
     
    
     As Alberta's solar boom subsides, Ontario's next wave is just beginning 
    
     
    
     
    
    
    - ![Pr employee men scott fleming retouch web SQ LR BBA](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/204270/pr_employee_men_scott-fleming_retouch_web_SQ_LR_BBA.webp)
    - ![Brenden Marchewka](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/203981/Brenden-Marchewka.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/as-albertas-solar-boom-subsides-ontarios-next-wave-is-just-beginning "As Alberta's solar boom subsides, Ontario's next wave is just beginning")
- [  22 Sep 2026 
    
     Deep Sky Alpha recognized at the Grands Prix du génie-conseil québécois 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/news/deep-sky-alpha-recognized-at-the-grands-prix-du-genie-conseil-quebecois "Deep Sky Alpha recognized at the Grands Prix du génie-conseil québécois")
 
 

       

 

 

   

 Let’s see what  
we can do  
together [ Contact us    

 ](https://www.bbaconsultants.com/en-ca/contact) 

 

   

 1. ## Our experts' solutions
    
    BBA’s experience in construction, site supervision and project management helped prioritize deliverables to meet a very demanding project schedule.
    
    
    - Electrical and automation detailed engineering for over 300 instruments
    - Electrical equipment specifications
    - Control philosophy
    - Construction support
    - Commissioning
    - Structural review and design
    - Review of hazardous zones classification
    - Arc-flash studies
    - Factory acceptance testing (FAT)