IAMGOLD wanted to acquire a 225 kV transmission line to power its Essakane mining facilities located in the desert zone of northeastern Burkina Faso. Based on BBA expert studies, the mining company opted for solar energy, a solution that resulted in millions of dollars in annual diesel fuel savings.

 

- Region International
- Client  IAMGOLD Corporation
 
 

 

 

   1. ## Our experts' solutions
    
    BBA initially performed the feasibility study, which demonstrated major benefits that would result from building a solar photovoltaic power plant as an alternative power source to the existing 57 MW diesel plant at the mine. BBA then oversaw the integration of the 15 MW, 6.6 kV photovoltaic farm to the facilities. The firm also provided specialized technical services during negotiations for the power purchase agreement with the private company responsible for operating the solar farm and supervised construction work as the Owner’s Engineer. The implemented solutions included:
    
    
    - Economic study (cost analysis) to assess effects of the solar power plant on fuel consumption from diesel generators
    - Assessment of the potential maximum power output of onsite solar resources
    - Choice of technology, including PV panels, transformers, AC and DC cables and DC connection boxes for the converter station
    - Impact assessment of the solar farm on the existing electrical distribution system
    - Coordination of electrical and structural construction work
    - Support for commissioning to ensure compliance with the power purchase agreement
 
        

  

  

 

 1. > Because they were present at the mine site, the BBA Project Leaders were able to quickly apply their management skills to ensure that adding the solar farm to the thermal power plant would not impact mining operations. For their part, engineers at the Mont-Saint-Hilaire offices supported IAMGOLD in every contractual and technical aspect of this major project.
    
     IAMGOLD
2. - 15 MW of installed solar power capacity
    - 6 million Annual savings of 6 million litres in fuel
    - 10% Up to 10% renewable energy penetration on the system
 
   - [  22 Sep 2026 
    
     Deep Sky Alpha recognized at the Grands Prix du génie-conseil québécois 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/news/deep-sky-alpha-recognized-at-the-grands-prix-du-genie-conseil-quebecois "Deep Sky Alpha recognized at the Grands Prix du génie-conseil québécois")
- [  14 Sep 2026 Other Industries  
    
     
    
     Climate resilience planning is essential for long-term project performance 
    
     
    
     
    
    
    - ![Pr employee men vincent clement retouch web SQ LR BBA](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/204267/pr_employee_men_vincent-clement_retouch_web_SQ_LR_BBA.webp)
    - ![Kate Ross](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/216019/Kate-Ross.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/climate-resilience-planning-is-essential-for-long-term-project-performance "Climate resilience planning is essential for long-term project performance")
- [  03 Sep 2026 
    
     Mike Bartlett appointed National Director – Environmental Development 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/news/mike-bartlett-appointed-national-director-environmental-development "Mike Bartlett appointed National Director – Environmental Development")
- [  02 Sep 2026 Mining and Metals  
    
     
    
     Why data quality is the real AI challenge in the mining industry 
    
     
    
     
    
    
    - ![Marie Eve Desrochers](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/215810/Marie-Eve-Desrochers.webp)
    - ![Guillaume Boily](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/215807/Guillaume-Boily.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/why-data-quality-is-the-real-ai-challenge-in-the-mining-industry "Why data quality is the real AI challenge in the mining industry")
 
 

       

 

 

   

 Let’s see what  
we can do  
together [ Contact us    

 ](https://www.bbaconsultants.com/en-ca/contact) 

 

   

 1. ## Our experts' solutions
    
    BBA initially performed the feasibility study, which demonstrated major benefits that would result from building a solar photovoltaic power plant as an alternative power source to the existing 57 MW diesel plant at the mine. BBA then oversaw the integration of the 15 MW, 6.6 kV photovoltaic farm to the facilities. The firm also provided specialized technical services during negotiations for the power purchase agreement with the private company responsible for operating the solar farm and supervised construction work as the Owner’s Engineer. The implemented solutions included:
    
    
    - Economic study (cost analysis) to assess effects of the solar power plant on fuel consumption from diesel generators
    - Assessment of the potential maximum power output of onsite solar resources
    - Choice of technology, including PV panels, transformers, AC and DC cables and DC connection boxes for the converter station
    - Impact assessment of the solar farm on the existing electrical distribution system
    - Coordination of electrical and structural construction work
    - Support for commissioning to ensure compliance with the power purchase agreement