This client’s two glycol furnaces were experiencing problems with frost accumulation on the flame detectors and humidity in the combustion chambers. According to the manufacturer, the problem was so severe that it seriously compromised the life of the furnaces.

 

- Region Multiple sites across Canada
- Client  Confidential
 
 

 

 

   1. ## Our experts' solutions
    
    BBA engineers worked closely with client personnel to identify the causes of these problems and find optimal solutions. After analyzing the proposed options, the client decided to replace the existing furnaces with new ones capable of handling condensation.
    
    The work was carried out by a multidisciplinary team with the following expertise: processes, mechanical and piping, electrical and automation, civil and structural.
    
    
    - Validated design capacities and required operating conditions
    - Identified connection points with existing facilities (piping, electrical installations, instrumentation, automation)
    - Performed test procedure for the new piping
    - Designed modifications and interconnections (piping, electrical and automation)
    - Performed engineering and modified input/output drawings (electrical and AIT) and new drawings for electrical distribution
    - Provided network architecture drawings
    - Integrated new boilers into the process control procedure
    - Modified programming
    - Dismantled control logic from old boilers
    - Tested communications and validated electrical equipment for new boilers at the supplier
    - Pre-operational verification and commissioning
 
        

  

  

 

    - [  11 Nov 2026 Mining and Metals  
    
     
    
     Maximizing the value of mining data, from smart sensing to operational intelligence 
    
     
    
     
    
    
    - ![Marie Eve Desrochers2](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/219093/Marie-Eve-Desrochers2.webp)   
        
         Marie-Eve Desrochers
        
        Senior analyst, Process control and operational technologies
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/maximizing-the-value-of-mining-data-from-smart-sensing-to-operational-intelligence "Maximizing the value of mining data, from smart sensing to operational intelligence")
- [  10 Nov 2026 Mining and Metals  
    
     
    
     Permits as drivers of design and investment decisions 
    
     
    
     
    
    
    - ![Mike bartlett](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212262/mike-bartlett.webp)
    - ![Yves Thomassin](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/219195/Yves-Thomassin.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/permits-as-drivers-of-design-and-investment-decisions "Permits as drivers of design and investment decisions")
- [  09 Nov 2026 
    
     Naomi Price appointed Global Sales Director, Strategic Advisory 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/news/naomi-price-appointed-global-sales-director-strategic-advisory "Naomi Price appointed Global Sales Director, Strategic Advisory")
- [  30 Oct 2026 
    
     Two BBA projects honoured at the ACEC National Awards gala 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/news/two-bba-projects-honoured-at-the-acec-national-awards-gala "Two BBA projects honoured at the ACEC National Awards gala")
 
 

       

 

 

   

 Let’s see what  
we can do  
together [ Contact us    

 ](https://www.bbaconsultants.com/en-ca/contact) 

 

   

 1. ## Our experts' solutions
    
    BBA engineers worked closely with client personnel to identify the causes of these problems and find optimal solutions. After analyzing the proposed options, the client decided to replace the existing furnaces with new ones capable of handling condensation.
    
    The work was carried out by a multidisciplinary team with the following expertise: processes, mechanical and piping, electrical and automation, civil and structural.
    
    
    - Validated design capacities and required operating conditions
    - Identified connection points with existing facilities (piping, electrical installations, instrumentation, automation)
    - Performed test procedure for the new piping
    - Designed modifications and interconnections (piping, electrical and automation)
    - Performed engineering and modified input/output drawings (electrical and AIT) and new drawings for electrical distribution
    - Provided network architecture drawings
    - Integrated new boilers into the process control procedure
    - Modified programming
    - Dismantled control logic from old boilers
    - Tested communications and validated electrical equipment for new boilers at the supplier
    - Pre-operational verification and commissioning