How can a manager or supervisor address a control system performance issue? Do control loops provide value for money?

We suggest a three-step approac­h to answer these fundamental questions and suggest a few aspects to consider at each step.

 

1. ## Are the controls used?
    
    
    - The method used is the system’s intended control method (automatic or cascade, not manual)
    - The control element (valve, variable speed drive or other) does not reach its limits
    - There is no interlock to prevent the controller from performing its functions.
    - The equipment is operating
    
    When all four of the statements are true, a system is being used. Incidentally, these statements should be true over 90% of the time for all control loops.
    
    ## Are the controls functional?
    
    Each control loop should lead the process to the set point on schedule. To do so, the loop must be stable, without oscillation. Thus, control systems are deemed functional provided:
    
    
    - the oscillation index is below 0.4 (any oscillations disappear quickly)
    - the stiction is weak
    - the settling time is ± 50% of what is expected
    
    Systems are functional when all three of the above conditions are met. These conditions should be met over 90% of the time for all control loops.
    
    ## Are the controls efficient?
    
    Controls are considered efficient if the systems can maintain the variable value at the set point. Performance is usually measured with one of the following methods:
    
    
    - variability
    - integral of absolute error (IAE)
    - overshoot or maximum permissible error
    
    The degree to which the objective is achieved must be measured for each loop. This value should exceed 90% for all loops.
    
    Overall performance is obtained by multiplying the following:
    
    %Use \* %Operation \* %Performance.
    
    In fact, the longer the observation period, the higher targets should be.
    
    For more information on this topic, contact our experts.
 
This content is for general information purposes only. All rights reserved ©BBA

 

    1. ![Michel Ruel](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/3310/Michel-Ruel.webp)   
    
     Michel Ruel, P.Eng.
    
    Expert, Process Control
    
         [  ](https://www.linkedin.com/in/michelruel/)
 
 

       

  

  

 

    - [  14 Oct 2026 Power and Renewables  
    
     
    
     Understanding regions and communities: human environment expertise supporting projects 
    
     
    
     
    
    
    - ![Burelle Marie Andree](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/218105/Burelle-Marie-Andree.webp)   
        
         Marie-Andrée Burelle
        
        Senior Environmental Professional
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/understanding-regions-and-communities-human-environment-expertise-supporting-projects "Understanding regions and communities: human environment expertise supporting projects")
- [  01 Oct 2026 Power and Renewables  
    
     
    
     Reliable power starts with the right grid interconnection strategy 
    
     
    
     
    
    
    - ![Jeremie Cote](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206702/Jeremie-Cote.webp)
    - ![Alizera Khosroshahi](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/216932/Alizera-Khosroshahi.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/reliable-power-starts-with-the-right-grid-interconnection-strategy "Reliable power starts with the right grid interconnection strategy")
- [  23 Sep 2026 Power and Renewables  
    
     
    
     As Alberta's solar boom subsides, Ontario's next wave is just beginning 
    
     
    
     
    
    
    - ![Pr employee men scott fleming retouch web SQ LR BBA](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/204270/pr_employee_men_scott-fleming_retouch_web_SQ_LR_BBA.webp)
    - ![Brenden Marchewka](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/203981/Brenden-Marchewka.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/as-albertas-solar-boom-subsides-ontarios-next-wave-is-just-beginning "As Alberta's solar boom subsides, Ontario's next wave is just beginning")
- [  14 Sep 2026 Other Industries  
    
     
    
     Climate resilience planning is essential for long-term project performance 
    
     
    
     
    
    
    - ![Pr employee men vincent clement retouch web SQ LR BBA](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/204267/pr_employee_men_vincent-clement_retouch_web_SQ_LR_BBA.webp)
    - ![Kate Ross](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/216019/Kate-Ross.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/climate-resilience-planning-is-essential-for-long-term-project-performance "Climate resilience planning is essential for long-term project performance")
 
 

       

 

 [ See all 

 ](https://www.bbaconsultants.com/en-ca/insights "Go to Publications listing page") 

 

   

 Let’s  
think it further  
together [ Contact us    

 ](https://www.bbaconsultants.com/en-ca/contact) 

 

   

  How can a manager or supervisor address a control system performance issue? Do control loops provide value for money?

We suggest a three-step approac­h to answer these fundamental questions and suggest a few aspects to consider at each step.

 

1. ## Are the controls used?
    
    
    - The method used is the system’s intended control method (automatic or cascade, not manual)
    - The control element (valve, variable speed drive or other) does not reach its limits
    - There is no interlock to prevent the controller from performing its functions.
    - The equipment is operating
    
    When all four of the statements are true, a system is being used. Incidentally, these statements should be true over 90% of the time for all control loops.
    
    ## Are the controls functional?
    
    Each control loop should lead the process to the set point on schedule. To do so, the loop must be stable, without oscillation. Thus, control systems are deemed functional provided:
    
    
    - the oscillation index is below 0.4 (any oscillations disappear quickly)
    - the stiction is weak
    - the settling time is ± 50% of what is expected
    
    Systems are functional when all three of the above conditions are met. These conditions should be met over 90% of the time for all control loops.
    
    ## Are the controls efficient?
    
    Controls are considered efficient if the systems can maintain the variable value at the set point. Performance is usually measured with one of the following methods:
    
    
    - variability
    - integral of absolute error (IAE)
    - overshoot or maximum permissible error
    
    The degree to which the objective is achieved must be measured for each loop. This value should exceed 90% for all loops.
    
    Overall performance is obtained by multiplying the following:
    
    %Use \* %Operation \* %Performance.
    
    In fact, the longer the observation period, the higher targets should be.
    