title: "Interconnection: 3 things renewable developers should know"
date: 2018-01-11T10:51:00-05:00
author: jessica napert
canonical_url: "https://www.bbaconsultants.com/en-ca/publications/interconnection-3-things-renewable-developers-should-know"
section: Publications
---
If you’ve been hibernating for the last two years, you’re waking up to a shockingly different renewable price environment. In your mind, PPAs for wind energy under $40/MWh in North America were forecasted for 2030 and beyond. I understand your confusion.

If you want your renewable projects that are currently under development to stand a chance in this new era, you must master all aspects of your project development process and consider the interconnection aspects right from the origination. The key mindsets are: be frugal, be strategic and be shrewd.

*Interconnection is now considered by developers’ community to be as important as resources, financing and social and environmental licensing.*

 

1. ## Be frugal: Don’t throw your development budget down the drain
    
    Make sure to include a high-level interconnection screening study in your first iteration of development. The last thing you want to do is commit a significant amount of your development budget to a fatally flawed project.
    
    The recommendation is to consult an experienced power system expert first and involve a regulatory consultant only after a successful first screening. This way, you’re reducing the chances of costly mistakes (time and money), like starting your interconnection application process on the wrong transmission circuit or the wrong voltage level.
    
    ## Be strategic : The right capacity in the right spot
    
    In the context of a public RFP, you must obviously comply with the rules of a pre-set game. You may be tempted to install the largest possible capacity based on the land you’ve been able to secure so you can maximize the economy of scale. That’s a fair approach. However, the grid capacity may force you to go in a different direction, and network upgrade costs could compromise the viability of your project.
    
    The suggested approach is to identify all interconnection options (transmission and distribution) and to assess each available capacity. Once done, you can compare projects within your portfolio and play your best card. If you have the latitude to do so, you can then decide to put forward other projects or loftier options from your initial case, knowing that you’re exceeding the available capacity in the area. This way, you have better control over your development portfolio and can take calculated risks during bids.
    
    ## Be shrewd: Think like the utility
    
    Let’s be fair and assume that utilities are generally not sharing a great deal of information on how they perceive your projects or their impact on the grid’s operations. We all know too well how frustrating it is to have all our communications channels with the utility cut off the minute an RFP is launched, leaving us with half–answered questions and only your instincts to rely on.
    
    One way to gain more confidence and mitigate project risks is to call upon a power system expert with system planning experience. You may think it’s too early to do so and that it will cost a fortune. My answer is simple: a real power system expert will compare your interconnection options in no time, since his or her brain is conditioned to think like the utility.
    
    So, being frugal, strategic and shrewd in this new era might not be so complicated after all…
 
This content is for general information purposes only. All rights reserved ©BBA

 

        

  

  

 

    - [  11 Nov 2026 Mining and Metals  
    
     
    
     Maximizing the value of mining data, from smart sensing to operational intelligence 
    
     
    
     
    
    
    - ![Marie Eve Desrochers2](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/219093/Marie-Eve-Desrochers2.webp)   
        
         Marie-Eve Desrochers
        
        Senior analyst, Process control and operational technologies
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/maximizing-the-value-of-mining-data-from-smart-sensing-to-operational-intelligence "Maximizing the value of mining data, from smart sensing to operational intelligence")
- [  10 Nov 2026 Mining and Metals  
    
     
    
     Permits as drivers of design and investment decisions 
    
     
    
     
    
    
    - ![Mike bartlett](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212262/mike-bartlett.webp)
    - ![Yves Thomassin](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/219195/Yves-Thomassin.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/permits-as-drivers-of-design-and-investment-decisions "Permits as drivers of design and investment decisions")
- [  27 Oct 2026 Mining and Metals  
    
     
    
     Why strategy, people and culture are reshaping gold mining leadership 
    
     
    
     
    
    
    - ![Pr employee women susan eick retouch web SQ LR BBA](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/205536/Pr-employee-women-susan-eick-retouch-web-SQ-LR-BBA.webp)
    - ![Photo de profil de Julie Butcher](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/202970/photo-de-profil-de-Julie-Butcher.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/why-strategy-people-and-culture-are-reshaping-gold-mining-leadership "Why strategy, people and culture are reshaping gold mining leadership")
- [  26 Oct 2026 Power and Renewables  
    
     
    
     Dewatering: strategic in achieving mining plan objectives 
    
     
    
     
    
    
    - ![Gabriel meilleur](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/218669/Gabriel-meilleur.webp)
    - ![Maxime Heroux](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/218673/Maxime-Heroux.webp)
    - ![Claude Caouette](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/218680/Claude-Caouette.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/dewatering-strategic-in-achieving-mining-plan-objectives "Dewatering: strategic in achieving mining plan objectives ")
 
 

       

 

 [ See all 

 ](https://www.bbaconsultants.com/en-ca/insights "Go to Publications listing page") 

 

   

 Let’s  
think it further  
together [ Contact us    

 ](https://www.bbaconsultants.com/en-ca/contact) 

 

   

  If you’ve been hibernating for the last two years, you’re waking up to a shockingly different renewable price environment. In your mind, PPAs for wind energy under $40/MWh in North America were forecasted for 2030 and beyond. I understand your confusion.

If you want your renewable projects that are currently under development to stand a chance in this new era, you must master all aspects of your project development process and consider the interconnection aspects right from the origination. The key mindsets are: be frugal, be strategic and be shrewd.

*Interconnection is now considered by developers’ community to be as important as resources, financing and social and environmental licensing.*

 

1. ## Be frugal: Don’t throw your development budget down the drain
    
    Make sure to include a high-level interconnection screening study in your first iteration of development. The last thing you want to do is commit a significant amount of your development budget to a fatally flawed project.
    
    The recommendation is to consult an experienced power system expert first and involve a regulatory consultant only after a successful first screening. This way, you’re reducing the chances of costly mistakes (time and money), like starting your interconnection application process on the wrong transmission circuit or the wrong voltage level.
    
    ## Be strategic : The right capacity in the right spot
    
    In the context of a public RFP, you must obviously comply with the rules of a pre-set game. You may be tempted to install the largest possible capacity based on the land you’ve been able to secure so you can maximize the economy of scale. That’s a fair approach. However, the grid capacity may force you to go in a different direction, and network upgrade costs could compromise the viability of your project.
    
    The suggested approach is to identify all interconnection options (transmission and distribution) and to assess each available capacity. Once done, you can compare projects within your portfolio and play your best card. If you have the latitude to do so, you can then decide to put forward other projects or loftier options from your initial case, knowing that you’re exceeding the available capacity in the area. This way, you have better control over your development portfolio and can take calculated risks during bids.
    
    ## Be shrewd: Think like the utility
    
    Let’s be fair and assume that utilities are generally not sharing a great deal of information on how they perceive your projects or their impact on the grid’s operations. We all know too well how frustrating it is to have all our communications channels with the utility cut off the minute an RFP is launched, leaving us with half–answered questions and only your instincts to rely on.
    
    One way to gain more confidence and mitigate project risks is to call upon a power system expert with system planning experience. You may think it’s too early to do so and that it will cost a fortune. My answer is simple: a real power system expert will compare your interconnection options in no time, since his or her brain is conditioned to think like the utility.
    
    So, being frugal, strategic and shrewd in this new era might not be so complicated after all…
 