Scott Fleming, P.Eng., PMP
Director, Wind and Solar
BBA supports data center developers and operators throughout the planning, design, and optimization of critical infrastructure. From power availability to commissioning, our multidisciplinary teams deliver integrated solutions focused on reliability, resilience, and long-term performance.
Our expertise in service of data centers
Your operational reality
Data centres need to keep pace with rapidly growing demand while ensuring continuous availability, strong resilience and sustainable performance. From accessing power and selecting a site to designing infrastructure and optimizing assets, every decision needs to help speed up deployment, reduce risk and support long-term performance.



Our approach
Data centres must balance power access, deployment speed, resilience and long-term performance. BBA brings together the expertise needed to address these challenges holistically, from initial planning to commissioning and facility optimization.
For more than 45 years, BBA has supported organizations operating critical infrastructure, where reliability, safety and performance are non-negotiable.
Result: infrastructure designed to perform in the toughest operating conditions
Power availability and interconnection timelines increasingly influence where, when and how quickly projects can be delivered. BBA steps in early to assess the constraints, options and risks that may determine their feasibility.
Result: better-informed decisions upfront to secure power, optimize investments, reduce risk and accelerate development
Whether your power comes from the public grid, an off-grid system or a hybrid solution, BBA has the experience to design and integrate complex, reliable and scalable power systems.
Result: a reliable, resilient power supply suited to your facility’s current and future needs
From initial planning and environmental assessments to engineering, commissioning and asset optimization, our teams work together to address the specific requirements of critical infrastructure.
Result: a better-integrated project, with decisions that factor in operational performance from the very beginning
A data centre's resilience depends as much on the robustness of its systems as on its ability to anticipate risks that could compromise its operations. BBA builds these considerations in from the planning and design stages.
Result: infrastructure better prepared for today's risks and tomorrow's conditions