title: Data centre design for COLO-D
date: 2021-03-12T14:59:00-05:00
author: jessica napert
canonical_url: "https://www.bbaconsultants.com/en-us/projects/data-centre-design-for-colo-d"
section: Projects
---
Colo-D is a North American leader in colocation data centre solutions. In fact, by adding its second data centre in the greater metropolitan region of Montréal in 2016, it became the largest provider of colocation services in Québec.

 

- Region Eastern Canada
- Client  COLO-D
 
 

 

 

   1. ## Our experts' solutions
    
    In 2014, BBA participated in building and expanding COLO-D’s first 20 MW data centre in Drummondville. The company mandated BBA again to perform the electrical design of their second data centre, with a 35 MW capacity, in Longueuil. In both instances, BBA’s mandate included designing and commissioning the centre’s 25 kV input, the critical low-voltage supply system, emergency generators and uninterruptible power supply (UPS) units.
    
    
    - TIER III (Uptime Institute) data centre design
    - Cutting-edge expertise in electrical design as well as critical networks and redundancy
    - Met tight deadlines, despite project complexity and high technical requirements
 
   

  

 

 1. > BBA has accredited experts in data centre design, which lends great credibility in the market.
    
     Yves Bétournay, ATD
2. - 55 MW combined capacity
    - 300,000 Total area of 300,000 square feet
    - Second largest colocation data centre provider in Canada
 
   - [  14 Sep 2026 Other industries  
    
     
    
     Climate resilience planning is essential for long-term project performance 
    
     
    
     
    
    
    - ![Pr employee men vincent clement retouch web SQ LR BBA](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/204267/pr_employee_men_vincent-clement_retouch_web_SQ_LR_BBA.webp)
    - ![Kate Ross](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/216019/Kate-Ross.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-us/insights/climate-resilience-planning-is-essential-for-long-term-project-performance "Climate resilience planning is essential for long-term project performance")
- [  03 Sep 2026 
    
     Mike Bartlett appointed National Director – Environmental Development 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-us/news/mike-bartlett-appointed-national-director-environmental-development "Mike Bartlett appointed National Director – Environmental Development")
- [  02 Sep 2026 Mining and Metals  
    
     
    
     Why data quality is the real AI challenge in the mining industry 
    
     
    
     
    
    
    - ![Marie Eve Desrochers](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/215810/Marie-Eve-Desrochers.webp)
    - ![Guillaume Boily](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/215807/Guillaume-Boily.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-us/insights/why-data-quality-is-the-real-ai-challenge-in-the-mining-industry "Why data quality is the real AI challenge in the mining industry")
- [  17 Aug 2026 
    
     Marc-André Langlais appointed Chief Technology Officer 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-us/news/marc-andre-langlais-appointed-chief-technology-officer "Marc-André Langlais appointed Chief Technology Officer")
 
 

       

 

 

   

 Let’s see what  
we can do  
together [ Contact us    

 ](https://www.bbaconsultants.com/en-us/contact) 

 

   

 1. ## Our experts' solutions
    
    In 2014, BBA participated in building and expanding COLO-D’s first 20 MW data centre in Drummondville. The company mandated BBA again to perform the electrical design of their second data centre, with a 35 MW capacity, in Longueuil. In both instances, BBA’s mandate included designing and commissioning the centre’s 25 kV input, the critical low-voltage supply system, emergency generators and uninterruptible power supply (UPS) units.
    
    
    - TIER III (Uptime Institute) data centre design
    - Cutting-edge expertise in electrical design as well as critical networks and redundancy
    - Met tight deadlines, despite project complexity and high technical requirements