Perspectivas
-
02 sept 2026Minería y metalurgiaArtificial intelligence (AI) is playing an increasingly important role in the mining industry. Predictive maintenance for critical equipment, energy optimization, improved metallurgical recovery, asset monitoring and process anomaly detection are just a few of the many applications with significant potential benefits.However, when an AI project fails to deliver the expected results, the problem rarely lies with the algorithms themselves.In our experience, the main obstacles are usually related to data quality, availability and structure. Even the most sophisticated models cannot produce reliable recommendations if the data they rely on is incomplete, inconsistent or difficult to use.Before we talk about artificial intelligence, we first need to talk about data.Why data quality is the real AI challenge in the mining industry
-
11 ene 2018Energía Eléctrica y RenovablesInterconnection: 3 things renewable developers should know
-
05 dic 2017Energía Eléctrica y RenovablesThe benefits of witnessing electrical factory acceptance tests (FATS)
-
Maurice Brisson, Ing., M.C.A.
Experto Consultor Senior, Planificación de Sistemas Eléctricos
-
-
06 oct 2017Energía Eléctrica y RenovablesRevisiting electrical energy saving initiatives for industrial facilities
-
Aaron Mc Loughlan
Electrical Engineer-in-Training (EIT)
-
-
05 jul 2017Otras IndustriasCombustible dust: managing explosion hazards more effectively – Part 2
-
Hugues Châteauneuf, P.Eng.
Senior Consulting Expert, Ventilation, Hazardous Locations, Explosion Hazards
-
-
05 jul 2017Energía Eléctrica y RenovablesIt’s difficult to answer this question without proper measurements. However, we know that industries are losing millions of dollars yearly due to unplanned shutdowns related to communication disruptions created by ground loop currents.Is your control system ground in good working condition?-
Pierre Girard, P.Eng.
National Practice Leader, Electrical
-
-
15 jun 2017Otras IndustriasCriteria for data centre location
-
Yves Bétournay, P.Eng., ATD
Ingeniero Senior y Líder Nacional de Práctica, Ingeniería Eléctrica
-
-
06 jun 2017Energía Eléctrica y RenovablesArc-flash hazard on direct current (DC) systems
-
06 jun 2017Minería y metalurgiaDesign and mining simulations
-
-
12 may 2017Energía Eléctrica y RenovablesWhat everyone should know about hydraulic balancing
-
François St-Germain, P.Eng.
Principal Engineer, Industrial and Hydro
-
-
09 mar 2017Energía Eléctrica y RenovablesAlthough new hydroelectric generating stations are still being built all around the world, and a number of projects for future generating stations are being studied, the vast majority of stations now in operation were built over 20 years ago, and some even date back more than 50 years. There are numerous factors that make refurbishing these generating stations inevitable, the most obvious being equipment wear, fouling of pipes and greater maintenance requirements.The challenge of refurbishing hydroelectric generating stations -
22 sept 2016Energía Eléctrica y RenovablesOff-grid hybrid systems through adaptive power setpoints
-
Stéphan Landry, P.Eng.
Principal Engineer, Electrical - Power Generation and Apparatus
-
-
05 jul 2016Minería y metalurgiaSmoke tracing: a diagnostic tool for ventilation
-
Hugues Châteauneuf, P.Eng.
Senior Consulting Expert, Ventilation, Hazardous Locations, Explosion Hazards
-
-
05 jul 2016Energía Eléctrica y RenovablesSwitching transient analyses: a worthwhile investment!
-
Maurice Brisson, Ing., M.C.A.
Experto Consultor Senior, Planificación de Sistemas Eléctricos
-
-
05 jul 2016Minería y metalurgiaNFPA 652-2016: owner responsibility for industrial installations in Canada
-
Hugues Châteauneuf, P.Eng.
Senior Consulting Expert, Ventilation, Hazardous Locations, Explosion Hazards
-
-
05 may 2016Energía Eléctrica y RenovablesIn remote locations, industrial clients sometimes mistakenly tend to overlook interconnecting to utility grids because of the required higher initial investment.High-level evaluation of transmission line parameters and energy costs for industrial loads in remote locations -
-
05 abr 2016Otras IndustriasCombustible dust: controlling the risk of explosion – Part 1
-
Hugues Châteauneuf, P.Eng.
Senior Consulting Expert, Ventilation, Hazardous Locations, Explosion Hazards
-
-
14 mar 2016Energía Eléctrica y RenovablesDistrict heating: Steam system optimization or hot water conversion?
-
Réal Olivier, P.Eng.
Engineering Graduate, Energy and Air Quality
-
-
27 ago 2015Minería y metalurgiaAdoption of high oxygen bottom blowing in copper matte smelting: Why is it taking so long?
-
Joël Kapusta, Ph.D.
Expert sénior en consultoría, inyección sónico y pirometalurgia
-
-
27 ago 2015Minería y metalurgiaUnderground stope drill and blast designs optimization program
-
05 jul 2015Energía Eléctrica y RenovablesA number of problems can come up when carrying out conventional site surveys. Obstacles include limited access, measurement accuracy dependent on the instrument used, hard-to-reach areas, and the risk of overlooking certain measurements. As a result, a detailed survey can be a long and costly endeavour-not to mention that current plans are not always available!Everything you need to know about 3D laser scanning -
09 ene 2015Minería y metalurgiaTonnage control under maximum and instantaneous power constraints
-
Serge Naud, P.Eng.
Engineer, Process Control
-
-
09 may 2014Minería y metalurgiaPotential economic and operational benefits and impacts of trolley assist in open pit mining
-
Isabelle Leblanc, Ing.
Vicepresidenta de Mercado de Minería y Metales
-