Perspectivas
-
02 sept 2026Minería y metalurgiaArtificial intelligence (AI) is playing an increasingly important role in the mining industry. Predictive maintenance for critical equipment, energy optimization, improved metallurgical recovery, asset monitoring and process anomaly detection are just a few of the many applications with significant potential benefits.However, when an AI project fails to deliver the expected results, the problem rarely lies with the algorithms themselves.In our experience, the main obstacles are usually related to data quality, availability and structure. Even the most sophisticated models cannot produce reliable recommendations if the data they rely on is incomplete, inconsistent or difficult to use.Before we talk about artificial intelligence, we first need to talk about data.Why data quality is the real AI challenge in the mining industry
-
03 oct 2019Energía Eléctrica y RenovablesDemystify the integration of new technologies
-
Marc-André Perron, P.Eng.
Director, Management - Digital Power Systems
-
-
01 oct 2019Energía Eléctrica y RenovablesHydro generators: introduction to stator windings
-
François St-Germain, P.Eng.
Principal Engineer, Industrial and Hydro
-
-
23 sept 2019Otras IndustriasSave time and money when integrating your new systems
-
Mario Côté, P.Eng.
Senior Engineer, Automation
-
-
16 sept 2019Energía Eléctrica y RenovablesAlarm rationalization: a guide for quick wins!
-
Maxym Lachance, P.Eng.
Ingeniero senior, control de procesos y tecnologías operacionales
-
-
04 sept 2019Energía Eléctrica y RenovablesMedium and high-voltage electrical equipment found in substations and industrial facilities need DC power in order to provide uninterrupted power to emergency systems, to protection devices and, in some cases, to computer systems and programmable logic controllers (PLCs). If a power outage occurs, batteries can reliably supply uninterrupted DC power that is independent of your AC power system.Stationary batteries: Will yours work when you need them?-
Dominic Dubreuil, P.Eng.
Electrical Engineer
-
-
04 sept 2019Energía Eléctrica y RenovablesThe challenges of integrating renewable energy sources into off-grid power systems
-
Stéphan Landry, P.Eng.
Principal Engineer, Electrical - Power Generation and Apparatus
-
-
15 ago 2019Energía Eléctrica y RenovablesIntegrating a renewable energy source into mining: six key steps
-
Jean-Philippe Castonguay, P.Eng.
Director - Off-Grid Hybrid Power & Energy Storage
-
-
09 ago 2019Energía Eléctrica y RenovablesSupporting indigenous communities with environmental management plans
-
Vincent Clément, P.Biol., RP.Bio., QAES
Profesional Senior de Medio Ambiente
-
-
05 ago 2019Energía Eléctrica y RenovablesDo you need advanced control?
-
Michel Ruel, P.Eng.
Expert, Process Control
-
-
22 jul 2019Minería y metalurgiaSlurry pumping and transportation is a complex process that requires specialized knowledge, comprehensive testwork and collaboration with third parties, such as pump suppliers. Here is an overview of the important components to consider when sizing systems and selecting equipment.Slurry engineering: what to consider-
Roman Dorfman, P.Eng.
Principal Engineer, Piping
-
-
05 jul 2019Energía Eléctrica y RenovablesPromoting environmental and social compliance of your projects
-
Vincent Clément, P.Biol., RP.Bio., QAES
Profesional Senior de Medio Ambiente
-
-
03 jul 2019Energía Eléctrica y RenovablesDigital Power Systems and Grid Modernization
-
-
02 jul 2019Minería y metalurgiaStructural expertise in ore loading pockets
-
-
27 jun 2019Energía y químicosProven methods for reducing sulfur dioxide (SO2) emissions
-
Joe Nava, Ing.
Director global, combustibles y productos químicos avanzados
-
-
14 jun 2019Energía Eléctrica y RenovablesOne of the biggest challenges to tackle when adopting and integrating new digital technology is knowing where to start. There are so many buzzwords, concepts and technologies when it comes to Industry 4.0 that you need to take a step back when selecting the best solutions for your business.Integrating digital technology: Ready, set, go!-
Marc-André Perron, P.Eng.
Director, Management - Digital Power Systems
-
-
13 jun 2019Energía Eléctrica y RenovablesNERC regulatory compliance program: where to start
-
Eric Breault, P.Eng.
Senior Engineer, Electrical - Power Systems, Protection and Control
-
-
11 jun 2019Energía Eléctrica y RenovablesEngineers’ responsibilities: Which version of the National Building Code should be used?
-
Bertrand Comeau, P.Eng.
Principal Engineer, Structural
-
-
05 jun 2019Otras IndustriasSuccessfully integrate your new systems!
-
Mario Côté, P.Eng.
Senior Engineer, Automation
-
-
23 may 2019Energía Eléctrica y RenovablesIEEE 1584-2018 guide for performing arc-flash hazard calculations: comparative analysis with IEEE 1584-2002
-
Joel Sourceaux, P.Eng.
Principal Engineer, Electrical - Power Systems, Protection and Control
-
-
17 may 2019Energía Eléctrica y RenovablesMake your operational data talk -
-
17 may 2019Energía Eléctrica y RenovablesThe cyber risks of introducing new technologies into your operations
-
José Alvarado, P.Eng., GICSP
Director, ICS Cybersecurity
-
-
16 may 2019Energía Eléctrica y RenovablesHydraulic simulation with 3D computational fluid dynamic modelling in a flood event
-
Glen Ichikawa, P.Eng.
Senior Engineer - Hydropower
-
-
15 may 2019Energía Eléctrica y RenovablesCut your commissioning time with process control
-
Marc Tardif, Technologist.
Senior Advisor, Operations - Salt Lake City office
-
-
25 abr 2019Energía Eléctrica y RenovablesControl risks of explosion in your plant
-
Hugues Châteauneuf, P.Eng.
Senior Consulting Expert, Ventilation, Hazardous Locations, Explosion Hazards
-
-
22 abr 2019Minería y metalurgiaGovernment representatives can ask to conduct a plant inspection—a request that may worry facility owners. This article discusses air quality management and will inform you on how inspections are carried out and what you can do to ensure your facilities comply with government air quality standards. A number of things can prompt the Ministère de l’Environnement et de la Lutte contre les changements climatiques (MELCC) to undertake a plant inspection, including citizen complaints. Close to 70% of complaints from the public have to do with problems about odours or dust.What to do during an inspection by the Ministère de l'environnement-
David Giard, P.Eng., M.Sc.
Senior Engineer, Environmental Engineering
-
-
19 abr 2019Energía Eléctrica y RenovablesCorona: a problem you should not ignore
-
Samuel Gendron, P.Eng.
Senior Engineer, Field Services
-
-
11 abr 2019Energía Eléctrica y RenovablesManaging power system harmonics for underground mines
-
Stéphan Landry, P.Eng.
Principal Engineer, Electrical - Power Generation and Apparatus
-
-
08 abr 2019Energía Eléctrica y RenovablesWT steel: When should you use it?
-
Monika Rybarova, P.Eng., M.A.Sc., P.M.P.
Principal Engineer, Structural
-
-
08 abr 2019Energía Eléctrica y RenovablesOptimize conception with constructability
-
Vincent Hudon, P.Eng.
Department Manager, Construction
-
-
02 abr 2019Energía Eléctrica y RenovablesWhen a project moves from the study phase to the execution phase, the client’s project team often focuses on choosing the engineering firm and planning construction work. At this stage, commissioning seems to be no more than a distant milestone in the project schedule. As a result, the project team does not consider it an urgent matter for discussion, because so many other priorities are jostling for their attention at this time. During the execution phase, if the client does have an operational readiness team, it is a small one. This makes it difficult to get the client to take an interest in operational readiness activities and commissioning of its project. And yet there are benefits in addressing this subject as soon as project execution begins, and even at the study phase.Operational readiness and commissioning plans: the key to a successful start-
Sylvain Boily, P. Eng., MBA, P.M.P.
Commissioning Manager, Operational Readiness and Commissioning
-