Colo-D is a North American leader in colocation data centre solutions. In fact, by adding its second data centre in the greater metropolitan region of Montréal in 2016, it became the largest provider of colocation services in Québec.

 

- Región Este de Canadá
- Cliente  COLO-D
 
 

 

 

   1. ## Our experts' solutions
    
    In 2014, BBA participated in building and expanding COLO-D’s first 20 MW data centre in Drummondville. The company mandated BBA again to perform the electrical design of their second data centre, with a 35 MW capacity, in Longueuil. In both instances, BBA’s mandate included designing and commissioning the centre’s 25 kV input, the critical low-voltage supply system, emergency generators and uninterruptible power supply (UPS) units.
    
    
    - TIER III (Uptime Institute) data centre design
    - Cutting-edge expertise in electrical design as well as critical networks and redundancy
    - Met tight deadlines, despite project complexity and high technical requirements
 
   

  

 

 1. > BBA has accredited experts in data centre design, which lends great credibility in the market.
    
     Yves Bétournay, ATD
2. - 55 MW combined capacity
    - 300,000 Total area of 300,000 square feet
    - Second largest colocation data centre provider in Canada
 
   - [  12 ago 2026 
    
     Four mistakes that can harm the future performance of industrial assets 
    
     
    
     
    
    
    - ![Caroline provost](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/208557/Caroline-provost.webp)   
        
         Caroline Provost P.Eng.
        
        Director, Operational Strategy Implementation
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/four-mistakes-that-can-harm-the-future-performance-of-industrial-assets "Four mistakes that can harm the future performance of industrial assets")
- [  29 jul 2026 
    
     Sachin Jari appointed Principal Director &amp; Head of Commercial Strategy and Business Development 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/news/sachin-jari-appointed-principal-director-head-of-commercial-strategy-and-business-development "Sachin Jari appointed Principal Director & Head of Commercial Strategy and Business Development")
- [  27 jul 2026 Minería y metalurgia  
    
     
    
     Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/las-decisiones-sobre-relaves-definen-desempeno-mina-a-largo-plazo "Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo")
- [  02 jul 2026 Minería y metalurgia  
    
     
    
     Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/python-una-herramienta-clave-para-analisis-datos-en-procesamiento-minerales "Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales")
 
 

       

 

 

   

 Veamos lo  
que podemos  
hacer juntos [ Póngase en contacto con nosotros    

 ](https://www.bbaconsultants.com/es-cl/p%C3%B3ngase-en-contacto-con-nosotros) 

 

   

 1. ## Our experts' solutions
    
    In 2014, BBA participated in building and expanding COLO-D’s first 20 MW data centre in Drummondville. The company mandated BBA again to perform the electrical design of their second data centre, with a 35 MW capacity, in Longueuil. In both instances, BBA’s mandate included designing and commissioning the centre’s 25 kV input, the critical low-voltage supply system, emergency generators and uninterruptible power supply (UPS) units.
    
    
    - TIER III (Uptime Institute) data centre design
    - Cutting-edge expertise in electrical design as well as critical networks and redundancy
    - Met tight deadlines, despite project complexity and high technical requirements