---
title: Detailed engineering and commissioning for a pilot project to capture CO2
date: 2021-05-05T11:18:00-04:00
author: jessica napert
canonical_url: "https://www.bbaconsultants.com/es-cl/projects/detailed-engineering-and-commissioning-for-a-pilot-project-to-capture-co2"
section: Projects
---
BBA was involved in a CO2 capture demonstration project of 30 tonnes per day with Svante at the Husky Energy industrial gas boiler plant in Lashburn, Saskatchewan, Canada.  
  
Svante (formerly Inventys Thermal Technologies) offers companies in emissions-intensive industries a commercially viable way to capture large-scale CO2 emissions from existing infrastructure, either for safe storage or to be recycled for further industrial use in a closed loop. With the ability to capture CO2 directly from industrial sources at less than half the capital cost of existing solutions, Svante makes industrial-scale carbon capture a reality. It is a rapid cycle temperature swing adsorption (TSA) based process with a proprietary intensified process cycle, novel structured adsorbent filters and low-cost continuous rotating adsorption equipment.

 

- Región Oeste de Canadá
- Cliente  Svante
 
 

 

 

   1. ## Our experts' solutions
    
    BBA’s experience in construction, site supervision and project management helped prioritize deliverables to meet a very demanding project schedule.
    
    
    - Electrical and automation detailed engineering for over 300 instruments
    - Electrical equipment specifications
    - Control philosophy
    - Construction support
    - Commissioning
    - Structural review and design
    - Review of hazardous zones classification
    - Arc-flash studies
    - Factory acceptance testing (FAT)
 
        

  

  

 

 1. > BBA is a world-class EPCM organization. The team assigned to our project was very professional and provided innovative solutions.
    
     Claude Létourneau, President &amp; CEO, Svante
2. - 200,000 One Svante commercial-scale installation can remove the equivalent CO2 of 200,000 cars per year doing the same job of 10 million trees
    - 80% reduction target in Canadian GHG emissions by 2030
    - 704 Mt of CO2 produced in 2016 in Canada
 
   - [  12 ago 2026 
    
     Four mistakes that can harm the future performance of industrial assets 
    
     
    
     
    
    
    - ![Caroline provost](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/208557/Caroline-provost.webp)   
        
         Caroline Provost P.Eng.
        
        Director, Operational Strategy Implementation
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/four-mistakes-that-can-harm-the-future-performance-of-industrial-assets "Four mistakes that can harm the future performance of industrial assets")
- [  29 jul 2026 
    
     Sachin Jari appointed Principal Director &amp; Head of Commercial Strategy and Business Development 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/news/sachin-jari-appointed-principal-director-head-of-commercial-strategy-and-business-development "Sachin Jari appointed Principal Director & Head of Commercial Strategy and Business Development")
- [  27 jul 2026 Minería y metalurgia  
    
     
    
     Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/las-decisiones-sobre-relaves-definen-desempeno-mina-a-largo-plazo "Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo")
- [  02 jul 2026 Minería y metalurgia  
    
     
    
     Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/python-una-herramienta-clave-para-analisis-datos-en-procesamiento-minerales "Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales")
 
 

       

 

 

   

 Veamos lo  
que podemos  
hacer juntos [ Póngase en contacto con nosotros    

 ](https://www.bbaconsultants.com/es-cl/p%C3%B3ngase-en-contacto-con-nosotros) 

 

   

 1. ## Our experts' solutions
    
    BBA’s experience in construction, site supervision and project management helped prioritize deliverables to meet a very demanding project schedule.
    
    
    - Electrical and automation detailed engineering for over 300 instruments
    - Electrical equipment specifications
    - Control philosophy
    - Construction support
    - Commissioning
    - Structural review and design
    - Review of hazardous zones classification
    - Arc-flash studies
    - Factory acceptance testing (FAT)
