Owned by Agnico Eagle, the Meliadine mining site is in Nunavut and isolated from the rest of Canada; it can only be accessed by boat or by plane. It has been one of the largest mining projects in Canada since 2015. A cogeneration plant had to be developed to power the site.

 Premios y reconocimientos- Canadian Consulting Engineering Awards - 2020 Award of Excellence
 
 

- Región Norte de Canadá
- Cliente  Agnico Eagle
- [ Caso práctico    
    
     ](https://www.assets.bbaconsultants.com/bba-production-assets/production/documents/pdf/BBA_Case-Study_Meliadine_Mine_Cogeneration_Plant_EN.pdf "Descargar el PDF de nuestro caso práctico")
 
 

 

 

   1. ## Our experts' solution
    
    BBA was mandated to carry out the detailed engineering for the 28 MW cogeneration plant as well as the site’s thermal and electrical systems. The firm also carried out the construction management and commissioning of the installations, thus delivering a complete and entirely functional system.  
      
    The 720 rpm generators and optimal design of the heat recovery system make it possible to have an estimated energy efficiency of 80%. Up to 24 MW of thermal energy can be recovered and used to heat all buildings at the main Meliadine site and provide much of the thermal energy required to heat the underground mine.  
      
    Other mandates carried out at the site include:
    
    
    - Design and commissioning of the 8 MW diesel power plant used during the mining site construction and development. This plant will serve as backup for the main power plant.
    - Technical support at the site while the electrical system for the underground mine was being developed.
    - Tests of all electrical equipment, including those for the ore processing plant.
    - Protection and arc flash study for the entire site, including the underground mine system.
    - Technical assistance to manage environmental water at the site.
 
        

  

  

 

 1. > In addition to respecting established budgets, the AEM and BBA team was able to start the power plant on schedule and on budget, to the client’s great satisfaction.
    
     Daniel Séguin P. Eng., Engineering and Commissioning Manager
2. - 720 rpm generators
    - 80% Heat recovery system energy efficiency of 80%
 
   - [  29 jul 2026 
    
     Sachin Jari appointed Principal Director &amp; Head of Commercial Strategy and Business Development 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/news/sachin-jari-appointed-principal-director-head-of-commercial-strategy-and-business-development "Sachin Jari appointed Principal Director & Head of Commercial Strategy and Business Development")
- [  27 jul 2026 Minería y metalurgia  
    
     
    
     Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/las-decisiones-sobre-relaves-definen-desempeno-mina-a-largo-plazo "Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo")
- [  02 jul 2026 Minería y metalurgia  
    
     
    
     Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/python-una-herramienta-clave-para-analisis-datos-en-procesamiento-minerales "Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales")
- [  02 jul 2026 
    
     Stéphanie Turbide appointed Office Director, Mont-Saint-Hilaire 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/news/stephanie-turbide-appointed-office-director-mont-saint-hilaire "Stéphanie Turbide appointed Office Director, Mont-Saint-Hilaire")
 
 

       

 

 

   

 Veamos lo  
que podemos  
hacer juntos [ Póngase en contacto con nosotros    

 ](https://www.bbaconsultants.com/es-cl/p%C3%B3ngase-en-contacto-con-nosotros) 

 

   

 1. ## Our experts' solution
    
    BBA was mandated to carry out the detailed engineering for the 28 MW cogeneration plant as well as the site’s thermal and electrical systems. The firm also carried out the construction management and commissioning of the installations, thus delivering a complete and entirely functional system.  
      
    The 720 rpm generators and optimal design of the heat recovery system make it possible to have an estimated energy efficiency of 80%. Up to 24 MW of thermal energy can be recovered and used to heat all buildings at the main Meliadine site and provide much of the thermal energy required to heat the underground mine.  
      
    Other mandates carried out at the site include:
    
    
    - Design and commissioning of the 8 MW diesel power plant used during the mining site construction and development. This plant will serve as backup for the main power plant.
    - Technical support at the site while the electrical system for the underground mine was being developed.
    - Tests of all electrical equipment, including those for the ore processing plant.
    - Protection and arc flash study for the entire site, including the underground mine system.
    - Technical assistance to manage environmental water at the site.