Cerro Moro is a gold and silver mining project developed by Yamana Gold in the Santa Cruz Province of southern Argentina. The project contains a number of narrow vein high-grade deposits, which will be mined using both open-pit and underground mining methods. The plant’s capacity is 1,000 tonnes per day and includes crushing, grinding and flotation.

 

- Región International
- Cliente  Yamana Gold
 
 

 

 

   1. ## Our experts' solutions
    
    After completing a feasibility study in 2015, Yamana implemented an infill drilling program and mandated BBA to update the open-pit and underground mine designs and to prepare a new optimized mine plan using the revised mineral resource estimate. BBA was mandated to perform the following tasks, which were completed using 10 block models and resulted in the design and scheduling of 14 open-pit and 6 underground mines:
    
    
    - Assessing the cut-off grades for the open-pit and underground mines
    - Estimating mining dilution and ore loss
    - Carrying out the pit optimization for the open pits and determining the economic transition to underground mining
    - Designing the open-pit and underground mines
    - Preparing an integrated life-of-mine plan for the open-pit and underground mines, including the ore stockpiling strategy
    - Designing and sequencing the waste rock piles
    - Selecting and estimating the production fleet and workforce requirements
    - Estimating mine capital and operating costs
 
        

  

  

 

 1. > The most interesting aspect of this project was the way we estimated mining dilution and ore loss for the open pits. We used Mineable Stope Optimizer, an application originally developed for stope design in underground mines. We have since repeated the same method for a narrow vein open‑pit lithium deposit in northern Québec.
    
     Jeffrey Cassoff, P.Eng., Team Leader, Mining Engineering
2. - 1,000 tonnes per day capacity
    - 14 open-pit mines
    - 6 underground mines
    - 135,000 Annual production of 135,000 ounces of gold
    - 6.7 million Annual production of 6.7 million ounces of silver
 
   - [  12 ago 2026 
    
     Four mistakes that can harm the future performance of industrial assets 
    
     
    
     
    
    
    - ![Caroline provost](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/208557/Caroline-provost.webp)   
        
         Caroline Provost P.Eng.
        
        Director, Operational Strategy Implementation
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/four-mistakes-that-can-harm-the-future-performance-of-industrial-assets "Four mistakes that can harm the future performance of industrial assets")
- [  29 jul 2026 
    
     Sachin Jari appointed Principal Director &amp; Head of Commercial Strategy and Business Development 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/news/sachin-jari-appointed-principal-director-head-of-commercial-strategy-and-business-development "Sachin Jari appointed Principal Director & Head of Commercial Strategy and Business Development")
- [  27 jul 2026 Minería y metalurgia  
    
     
    
     Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/las-decisiones-sobre-relaves-definen-desempeno-mina-a-largo-plazo "Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo")
- [  02 jul 2026 Minería y metalurgia  
    
     
    
     Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/python-una-herramienta-clave-para-analisis-datos-en-procesamiento-minerales "Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales")
 
 

       

 

 

   

 Veamos lo  
que podemos  
hacer juntos [ Póngase en contacto con nosotros    

 ](https://www.bbaconsultants.com/es-cl/p%C3%B3ngase-en-contacto-con-nosotros) 

 

   

 1. ## Our experts' solutions
    
    After completing a feasibility study in 2015, Yamana implemented an infill drilling program and mandated BBA to update the open-pit and underground mine designs and to prepare a new optimized mine plan using the revised mineral resource estimate. BBA was mandated to perform the following tasks, which were completed using 10 block models and resulted in the design and scheduling of 14 open-pit and 6 underground mines:
    
    
    - Assessing the cut-off grades for the open-pit and underground mines
    - Estimating mining dilution and ore loss
    - Carrying out the pit optimization for the open pits and determining the economic transition to underground mining
    - Designing the open-pit and underground mines
    - Preparing an integrated life-of-mine plan for the open-pit and underground mines, including the ore stockpiling strategy
    - Designing and sequencing the waste rock piles
    - Selecting and estimating the production fleet and workforce requirements
    - Estimating mine capital and operating costs