Because energy management is a key factor in the profitability of any remote mine, Agnico Eagle faced reliability and efficiency issues at its Meadowbank cogeneration plant in Nunavut, which led to higher fuel consumption than necessary.

 Premios y reconocimientos- Grand Prix du Génie-Conseil - AFG 2017
 
 

- Región Norte de Canadá
- Cliente  Agnico Eagle
 
 

 

 

   1. ## Our experts' solutions
    
    The solutions brought forward by our experts helped optimize the mine’s cogeneration plant, which led to a significant drop in operating costs.
    
    BBA’s recommended approach was based on a three-pronged strategy: stabilize electrical power generation, optimize plant efficiency and review asset management. One of the strategic drivers was to increase motor capacity to operate at higher speeds and increase reliability.
    
    The result: plant downtime decreased from 15 hours to fewer than 2 hours per year, which led to a revenue increase of $500,000. Finally, better synchronization of the building’s heating system and the heat recovery system resulted in an additional savings of $900,000 in diesel fuel per year.
 
        

  

  

 

 1. > One of the reasons this project was successful was because of the close collaboration between Agnico Eagle and BBA throughout the mandate. BBA’s continued effort to share knowledge with operational personnel not only achieved impressive results, but ensured these results would be sustainable. The plant maintains its performance year after year.
2. - $400,000 Fewer than $400,000 invested
    - $2,500,000 Annual savings of $2,500,000
    - 5,000 A 5,000 tonnes drop in GHG emissions per year
 
   - [  02 sept 2026 Minería y metalurgia  
    
     
    
     Why data quality is the real AI challenge in the mining industry 
    
     
    
     
    
    
    - ![Marie Eve Desrochers](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/215810/Marie-Eve-Desrochers.webp)
    - ![Guillaume Boily](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/215807/Guillaume-Boily.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/why-data-quality-is-the-real-ai-challenge-in-the-mining-industry "Why data quality is the real AI challenge in the mining industry")
- [  17 ago 2026 
    
     Marc-André Langlais appointed Chief Technology Officer 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/news/marc-andre-langlais-appointed-chief-technology-officer "Marc-André Langlais appointed Chief Technology Officer")
- [  17 ago 2026 
    
     Structural engineering early phase: unlocking value through early decisions 
    
     
    
     
    
    
    - ![Nicolas Samson](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/197852/Nicolas-Samson.webp)   
        
         Nicolas Samson, P.Eng.
        
        Senior Engineer, Structural
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/structural-engineering-early-phase-unlocking-value-through-early-decisions "Structural engineering early phase: unlocking value through early decisions")
- [  12 ago 2026 
    
     Four mistakes that can harm the future performance of industrial assets 
    
     
    
     
    
    
    - ![Caroline provost](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/208557/Caroline-provost.webp)   
        
         Caroline Provost P.Eng.
        
        Director, Operational Strategy Implementation
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/four-mistakes-that-can-harm-the-future-performance-of-industrial-assets "Four mistakes that can harm the future performance of industrial assets")
 
 

       

 

 

   

 Veamos lo  
que podemos  
hacer juntos [ Póngase en contacto con nosotros    

 ](https://www.bbaconsultants.com/es-cl/p%C3%B3ngase-en-contacto-con-nosotros) 

 

   

 1. ## Our experts' solutions
    
    The solutions brought forward by our experts helped optimize the mine’s cogeneration plant, which led to a significant drop in operating costs.
    
    BBA’s recommended approach was based on a three-pronged strategy: stabilize electrical power generation, optimize plant efficiency and review asset management. One of the strategic drivers was to increase motor capacity to operate at higher speeds and increase reliability.
    
    The result: plant downtime decreased from 15 hours to fewer than 2 hours per year, which led to a revenue increase of $500,000. Finally, better synchronization of the building’s heating system and the heat recovery system resulted in an additional savings of $900,000 in diesel fuel per year.