title: High-level evaluation of transmission line parameters and energy costs for industrial loads in remote locations
date: 2016-05-05T13:15:00-04:00
author: jessica napert
canonical_url: "https://www.bbaconsultants.com/es-cl/publications/high-level-evaluation-of-transmission-line-parameters-and-energy-costs-for-industrial-loads-in-remote-locations"
section: Publications
---
In remote locations, industrial clients sometimes mistakenly tend to overlook interconnecting to utility grids because of the required higher initial investment.

 

1. This white paper presents a strategy to:
    
    
    - Define high-level parameters for the power transmission system
    - Evaluate equivalent energy costs for specific industrial sites in remote locations
    - Determine whether a more detailed study is required
    
    The results can also serve as a baseline scenario for designing a transmission line.
 
This content is for general information purposes only. All rights reserved ©BBA

 

    1. ![3068](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/176530/3068.webp)   
    
     Eric Breault, P.Eng.
    
    Senior Engineer, Electrical - Power Systems, Protection and Control
    
         [  ](https://ca.linkedin.com/in/ericbreault)
2. ![Maurice Brisson canva](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/204414/Maurice-Brisson-canva.webp)   
    
     Maurice Brisson, Ing., M.C.A.
    
    Experto Consultor Senior, Planificación de Sistemas Eléctricos
    
         Leer bio    Maurice cuenta con más de 50 años de experiencia en sistemas de media y alta tensión, combinando experiencia técnica, liderazgo y visión estratégica para el suministro eléctrico de proyectos industriales, instalaciones de energía renovable y redes complejas de transmisión y distribución.
    
    **Áreas de especialización**
    
    
    - Estudios tecnoeconómicos y desarrollo de redes eléctricas
    - Protección, compensación reactiva y filtrado armónico para procesos industriales
    - Planificación y análisis de redes de transmisión y distribución
    - Diagnóstico, resolución de problemas y diseño de diagramas unifilares
    
    **Principales logros**
    
    Proyectos que incluyen estudios, optimización y rehabilitación de subestaciones de hasta 345 kV para complejos industriales y parques renovables de 40–350 MW, incluyendo planificación y evaluación del desempeño de sistemas industriales y renovables complejos.
    
    **Enfoque y valor añadido**
    
    Maurice aplica un enfoque riguroso y pragmático, asegurando decisiones e inversiones mientras apoya la transición energética mediante proyectos robustos y de alto desempeño.
 
 

       

  

  

 

     - [  17 ago 2026 
    
     Structural engineering early phase: unlocking value through early decisions 
    
     
    
     
    
    
    - ![Nicolas Samson](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/197852/Nicolas-Samson.webp)   
        
         Nicolas Samson, P.Eng.
        
        Senior Engineer, Structural
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/structural-engineering-early-phase-unlocking-value-through-early-decisions "Structural engineering early phase: unlocking value through early decisions")
- [  12 ago 2026 
    
     Four mistakes that can harm the future performance of industrial assets 
    
     
    
     
    
    
    - ![Caroline provost](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/208557/Caroline-provost.webp)   
        
         Caroline Provost P.Eng.
        
        Director, Operational Strategy Implementation
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/four-mistakes-that-can-harm-the-future-performance-of-industrial-assets "Four mistakes that can harm the future performance of industrial assets")
- [  27 jul 2026 Minería y metalurgia  
    
     
    
     Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/las-decisiones-sobre-relaves-definen-desempeno-mina-a-largo-plazo "Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo")
- [  02 jul 2026 Minería y metalurgia  
    
     
    
     Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/python-una-herramienta-clave-para-analisis-datos-en-procesamiento-minerales "Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales")
 
 

       

 

 [ Ver todo 

 ](https://www.bbaconsultants.com/es-cl/perspectivas "Ir a la página del listado de Publications") 

 

   

 Pensemos  
más [ Póngase en contacto con nosotros    

 ](https://www.bbaconsultants.com/es-cl/p%C3%B3ngase-en-contacto-con-nosotros) 

 

   

  In remote locations, industrial clients sometimes mistakenly tend to overlook interconnecting to utility grids because of the required higher initial investment.

 

1. This white paper presents a strategy to:
    
    
    - Define high-level parameters for the power transmission system
    - Evaluate equivalent energy costs for specific industrial sites in remote locations
    - Determine whether a more detailed study is required
    
    The results can also serve as a baseline scenario for designing a transmission line.
 