title: "IEEE 1584-2018 guide for performing arc-flash hazard calculations: comparative analysis with IEEE 1584-2002"
date: 2019-05-23T15:48:00-04:00
author: jessica napert
canonical_url: "https://www.bbaconsultants.com/es-cl/publications/ieee-1584-2018-guide-for-performing-arc-flash-hazard-calculations-comparative-analysis-with-ieee-1584-2002"
section: Publications
---
1. The IEEE 1584 Guide for Performing Arc-Flash Hazard Calculations provides equations for assessing the amount of thermal energy that a worker might receive from electrical equipment in the event of an arc flash. These equations have remained the same since the standard was first published in 2002. Based on the results of more than 1,800 tests, the 2018 edition of the guide provides formulas that are both more accurate and more complex and that take into account, in particular, the conductor configuration at the arc’s location as well as the dimensions of the equipment in which it occurs.
    
    This analysis will explain the differences between the 2002 and 2018 versions of the IEEE 1584 standard and measure the impact on results established with the 2002 calculation equations. Special attention must be paid to the configuration of conductors for the equipment analyzed given its impact on incident energy results. Finally, the complexity of the model must reflect the industrial reality: the expert must select, among the proposed parameters, those most representative of, and/or disadvantageous to, the actual installations and the work to be carried out on these.
 
This content is for general information purposes only. All rights reserved ©BBA

 

    1. ![Joël Sourceaux](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/3257/Joel-Sourceaux.webp)   
    
     Joel Sourceaux, P.Eng.
    
    Principal Engineer, Electrical - Power Systems, Protection and Control
    
         [  ](https://www.linkedin.com/in/joelsourceaux/)
 
 

       

  

  

 

     - [  17 ago 2026 
    
     Structural engineering early phase: unlocking value through early decisions 
    
     
    
     
    
    
    - ![Nicolas Samson](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/197852/Nicolas-Samson.webp)   
        
         Nicolas Samson, P.Eng.
        
        Senior Engineer, Structural
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/structural-engineering-early-phase-unlocking-value-through-early-decisions "Structural engineering early phase: unlocking value through early decisions")
- [  12 ago 2026 
    
     Four mistakes that can harm the future performance of industrial assets 
    
     
    
     
    
    
    - ![Caroline provost](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/208557/Caroline-provost.webp)   
        
         Caroline Provost P.Eng.
        
        Director, Operational Strategy Implementation
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/four-mistakes-that-can-harm-the-future-performance-of-industrial-assets "Four mistakes that can harm the future performance of industrial assets")
- [  27 jul 2026 Minería y metalurgia  
    
     
    
     Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/las-decisiones-sobre-relaves-definen-desempeno-mina-a-largo-plazo "Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo")
- [  02 jul 2026 Minería y metalurgia  
    
     
    
     Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/python-una-herramienta-clave-para-analisis-datos-en-procesamiento-minerales "Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales")
 
 

       

 

 [ Ver todo 

 ](https://www.bbaconsultants.com/es-cl/perspectivas "Ir a la página del listado de Publications") 

 

   

 Pensemos  
más [ Póngase en contacto con nosotros    

 ](https://www.bbaconsultants.com/es-cl/p%C3%B3ngase-en-contacto-con-nosotros) 

 

   

 1. The IEEE 1584 Guide for Performing Arc-Flash Hazard Calculations provides equations for assessing the amount of thermal energy that a worker might receive from electrical equipment in the event of an arc flash. These equations have remained the same since the standard was first published in 2002. Based on the results of more than 1,800 tests, the 2018 edition of the guide provides formulas that are both more accurate and more complex and that take into account, in particular, the conductor configuration at the arc’s location as well as the dimensions of the equipment in which it occurs.
    
    This analysis will explain the differences between the 2002 and 2018 versions of the IEEE 1584 standard and measure the impact on results established with the 2002 calculation equations. Special attention must be paid to the configuration of conductors for the equipment analyzed given its impact on incident energy results. Finally, the complexity of the model must reflect the industrial reality: the expert must select, among the proposed parameters, those most representative of, and/or disadvantageous to, the actual installations and the work to be carried out on these.
 
This content is for general information purposes only. All rights reserved ©BBA