Developing an electrical distribution network for an underground mine has its challenges and integrating new technologies, such as on-demand ventilation or battery-powered vehicles, must be considered at the design stage. Electronic equipment like variable frequency drives and battery chargers are known to generate harmonics, which can negatively affect all mining site installations.

 

1. Phase-shifting transformers can be used as part of the development strategy for the mine’s power system, as they eliminate some of the harmonics generated by electronic equipment. This is a simple, effective and economic way of limiting power system harmonics, a solution proven time and again in numerous industrial applications.
 
This content is for general information purposes only. All rights reserved ©BBA

 

    1. ![Stéphan Landry](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/3316/Stephan-Landry.webp)   
    
     Stéphan Landry, P.Eng.
    
    Principal Engineer, Electrical - Power Generation and Apparatus
    
         [  ](https://www.linkedin.com/in/stephan-landry-a4702035/)
 
 

  

  

 

     - [  17 ago 2026 
    
     Structural engineering early phase: unlocking value through early decisions 
    
     
    
     
    
    
    - ![Nicolas Samson](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/197852/Nicolas-Samson.webp)   
        
         Nicolas Samson, P.Eng.
        
        Senior Engineer, Structural
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/structural-engineering-early-phase-unlocking-value-through-early-decisions "Structural engineering early phase: unlocking value through early decisions")
- [  12 ago 2026 
    
     Four mistakes that can harm the future performance of industrial assets 
    
     
    
     
    
    
    - ![Caroline provost](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/208557/Caroline-provost.webp)   
        
         Caroline Provost P.Eng.
        
        Director, Operational Strategy Implementation
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/four-mistakes-that-can-harm-the-future-performance-of-industrial-assets "Four mistakes that can harm the future performance of industrial assets")
- [  27 jul 2026 Minería y metalurgia  
    
     
    
     Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/las-decisiones-sobre-relaves-definen-desempeno-mina-a-largo-plazo "Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo")
- [  02 jul 2026 Minería y metalurgia  
    
     
    
     Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/python-una-herramienta-clave-para-analisis-datos-en-procesamiento-minerales "Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales")
 
 

       

 

 [ Ver todo 

 ](https://www.bbaconsultants.com/es-cl/perspectivas "Ir a la página del listado de Publications") 

 

   

 Pensemos  
más [ Póngase en contacto con nosotros    

 ](https://www.bbaconsultants.com/es-cl/p%C3%B3ngase-en-contacto-con-nosotros) 

 

   

  Developing an electrical distribution network for an underground mine has its challenges and integrating new technologies, such as on-demand ventilation or battery-powered vehicles, must be considered at the design stage. Electronic equipment like variable frequency drives and battery chargers are known to generate harmonics, which can negatively affect all mining site installations.

 

1. Phase-shifting transformers can be used as part of the development strategy for the mine’s power system, as they eliminate some of the harmonics generated by electronic equipment. This is a simple, effective and economic way of limiting power system harmonics, a solution proven time and again in numerous industrial applications.
 
This content is for general information purposes only. All rights reserved ©BBA