Proponents and developers often have to obtain environmental approvals before proceeding with project construction or implementation. These approvals, which may come from various levels of government (federal, provincial or municipal), outline the effects of projects on biophysical and social environments.

 

1. Environmental protections and public opinion have become significant issues in the process of project acceptance and implementation.
    
    The proponents therefore have the advantage of establishing a development strategy, from the outset, that will promote project acceptability in a context of sustainable development. Here are recommendations to promote environmental and social compliance of your projects.
    
    ## The regulatory approvals process
    
    Regulatory compliance and the process to obtain approvals required by law can be complex, if not costly. But above all, they must be seen as:
    
    
    - A proponent’s roadmap
    - Assurance that the project can be implemented
    - An estimate for carrying out an acceptable and sustainable project
    - Strategic development thinking, and not a simple project description
    
    By giving importance to assessments and allocating the necessary resources to complete them, proponents will acquire a thorough knowledge of the receiving environment and the potential effects and risks of the project on this environment. Proponents can then reduce or mitigate the impacts and, at the same time, increase project acceptability.
    
    ## Environmental compliance
    
    (P) Projects are assessed by ministerial analysts based on their impacts on various valued components of the receiving environment and the regulations that protect and control them. As such, mitigating impacts to comply with existing laws and regulations requires rigorous planning of project activities and its footprint, as well as appropriate use of technologies (e.g., wastewater decontamination, filtration of atmospheric pollutants).
    
    This step is an **internal technical challenge.** To meet this challenge, the first thing is to design and implement a high quality project, then to optimize its planning and wind up with the best plan. This way, all the planning work performed upstream and the appropriateness of the chosen plan can be demonstrated.
    
    ## Social acceptability
    
    (P) There are numerous examples of projects that, although they receive the necessary government approvals, could not be implemented because of a lack of social acceptability. Whether based on well-founded reasons or lack of information, public opinion has become an essential decision-making criterion in project development. It is therefore important to create winning conditions for all stakeholders and to convince them that the project is both well-planned and socially acceptable.
    
    This step is an **external social challenge.** To meet this challenge, it is important to understand the history and characteristics of the area as well as public concerns and expectations. At this step, it is important to listen to the various viewpoints, and not just present your project. This approach will allow the proponent to achieve several objectives:
    
    
    - Gain a better understanding of the concerns of various stakeholders
    - Establish a trusting relationship with stakeholders and gain their respect
    - Demonstrate an attitude founded on transparency, openness and inclusion
    - Explain project objectives
    - Aim at harmonizing uses
    - Focus on common values
    
    Once this step is completed, planners will know what the irritants are and mitigation measures can be incorporated into the project to optimize planning. Performed upstream, this work will greatly enhance project acceptability, since stakeholders will have behaved proactively and not reactively.
    
    Here are some other reasons why it is important to start environmental and social assessments early in project planning:
    
    
    - The approval process is subject to logistical and governmental administrative constraints (expect analysis delays).
    - Biological characterization periods for the receiving environment are linked to seasons (e.g., snow cover, migration and spawning periods, vegetation growth season).
    - It is therefore much simpler to explain the project and reflect public demands in the planning process.
 
This content is for general information purposes only. All rights reserved ©BBA

 

    1. ![Pr employee men vincent clement retouch web SQ LR BBA](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/204267/pr_employee_men_vincent-clement_retouch_web_SQ_LR_BBA.webp)   
    
     Vincent Clément, P.Biol., RP.Bio., QAES
    
    Profesional Senior de Medio Ambiente
    
         Leer bio   [  ](https://www.linkedin.com/in/vincent-cl%C3%A9ment-2b503113/)  **Como consultor ambiental sénior, Vincent Clément tiene más de 30 años de experiencia asegurando proyectos energéticos e industriales** garantizando el cumplimiento normativo, reduciendo el riesgo y optimizando el desempeño.
    
    **Áreas de especialización**
    
    
    - Coordinación de evaluaciones ambientales, permisos y gestión normativa
    - Supervisión ambiental durante la construcción
    - Experiencia en energías renovables, gas e infraestructuras industriales
    - Miembro de la ASPB y del CAB BC
    
    **Principales logros**: Ejecución de más de 150 proyectos para la red de gas, incluida la supervisión de la construcción y la gestión de permisos estratégicos para proyectos de energías renovables.
    
    **Enfoque y valor añadido**: Vincent se anticipa a los retos normativos para acelerar el comisionamiento, asegurar las inversiones y garantizar el cumplimiento de los proyectos.
 
 

  

  

 

    - [  17 ago 2026 
    
     Structural engineering early phase: unlocking value through early decisions 
    
     
    
     
    
    
    - ![Nicolas Samson](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/197852/Nicolas-Samson.webp)   
        
         Nicolas Samson, P.Eng.
        
        Senior Engineer, Structural
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/structural-engineering-early-phase-unlocking-value-through-early-decisions "Structural engineering early phase: unlocking value through early decisions")
- [  12 ago 2026 
    
     Four mistakes that can harm the future performance of industrial assets 
    
     
    
     
    
    
    - ![Caroline provost](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/208557/Caroline-provost.webp)   
        
         Caroline Provost P.Eng.
        
        Director, Operational Strategy Implementation
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/four-mistakes-that-can-harm-the-future-performance-of-industrial-assets "Four mistakes that can harm the future performance of industrial assets")
- [  27 jul 2026 Minería y metalurgia  
    
     
    
     Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/las-decisiones-sobre-relaves-definen-desempeno-mina-a-largo-plazo "Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo")
- [  02 jul 2026 Minería y metalurgia  
    
     
    
     Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/python-una-herramienta-clave-para-analisis-datos-en-procesamiento-minerales "Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales")
 
 

       

 

 [ Ver todo 

 ](https://www.bbaconsultants.com/es-cl/perspectivas "Ir a la página del listado de Publications") 

 

   

 Pensemos  
más [ Póngase en contacto con nosotros    

 ](https://www.bbaconsultants.com/es-cl/p%C3%B3ngase-en-contacto-con-nosotros) 

 

   

  Proponents and developers often have to obtain environmental approvals before proceeding with project construction or implementation. These approvals, which may come from various levels of government (federal, provincial or municipal), outline the effects of projects on biophysical and social environments.

 

1. Environmental protections and public opinion have become significant issues in the process of project acceptance and implementation.
    
    The proponents therefore have the advantage of establishing a development strategy, from the outset, that will promote project acceptability in a context of sustainable development. Here are recommendations to promote environmental and social compliance of your projects.
    
    ## The regulatory approvals process
    
    Regulatory compliance and the process to obtain approvals required by law can be complex, if not costly. But above all, they must be seen as:
    
    
    - A proponent’s roadmap
    - Assurance that the project can be implemented
    - An estimate for carrying out an acceptable and sustainable project
    - Strategic development thinking, and not a simple project description
    
    By giving importance to assessments and allocating the necessary resources to complete them, proponents will acquire a thorough knowledge of the receiving environment and the potential effects and risks of the project on this environment. Proponents can then reduce or mitigate the impacts and, at the same time, increase project acceptability.
    
    ## Environmental compliance
    
    (P) Projects are assessed by ministerial analysts based on their impacts on various valued components of the receiving environment and the regulations that protect and control them. As such, mitigating impacts to comply with existing laws and regulations requires rigorous planning of project activities and its footprint, as well as appropriate use of technologies (e.g., wastewater decontamination, filtration of atmospheric pollutants).
    
    This step is an **internal technical challenge.** To meet this challenge, the first thing is to design and implement a high quality project, then to optimize its planning and wind up with the best plan. This way, all the planning work performed upstream and the appropriateness of the chosen plan can be demonstrated.
    
    ## Social acceptability
    
    (P) There are numerous examples of projects that, although they receive the necessary government approvals, could not be implemented because of a lack of social acceptability. Whether based on well-founded reasons or lack of information, public opinion has become an essential decision-making criterion in project development. It is therefore important to create winning conditions for all stakeholders and to convince them that the project is both well-planned and socially acceptable.
    
    This step is an **external social challenge.** To meet this challenge, it is important to understand the history and characteristics of the area as well as public concerns and expectations. At this step, it is important to listen to the various viewpoints, and not just present your project. This approach will allow the proponent to achieve several objectives:
    
    
    - Gain a better understanding of the concerns of various stakeholders
    - Establish a trusting relationship with stakeholders and gain their respect
    - Demonstrate an attitude founded on transparency, openness and inclusion
    - Explain project objectives
    - Aim at harmonizing uses
    - Focus on common values
    
    Once this step is completed, planners will know what the irritants are and mitigation measures can be incorporated into the project to optimize planning. Performed upstream, this work will greatly enhance project acceptability, since stakeholders will have behaved proactively and not reactively.
    
    Here are some other reasons why it is important to start environmental and social assessments early in project planning:
    
    
    - The approval process is subject to logistical and governmental administrative constraints (expect analysis delays).
    - Biological characterization periods for the receiving environment are linked to seasons (e.g., snow cover, migration and spawning periods, vegetation growth season).
    - It is therefore much simpler to explain the project and reflect public demands in the planning process.
 