title: Engineering and commissioning 34 wind turbines in the Gaspé
date: 2021-04-09T10:44:00-04:00
author: jessica napert
canonical_url: "https://www.bbaconsultants.com/es-cl/section-projects/engineering-and-commissioning-34-wind-turbines-in-the-gaspe"
section: Projects
---
Invenergy designs, owns and operates major renewable power plants in North America and Europe. Creating the Roncevaux wind farm, which started operating in 2017 in the Gaspé, was part of its business development strategy.

 

- Región Este de Canadá
- Cliente  Invenergy Wind LLC
 
 

 

 

   1. ## Our experts' solutions
    
    BBA performed the detailed engineering, project management and commissioning of the electrical substation and collector system for the Roncevaux wind farm, a 75 MW power plant composed of 34 wind turbines interconnected to Hydro-Québec’s 315 kV grid. BBA mitigated risks at the site by performing factory acceptance tests (FAT) on control panels and on the protection devices of control buildings.
    
    BBA team members provided the developer with technical support to connect the wind farm to the Hydro-Québec grid while meeting the agreed energization date. Our experts ensure coordination among project stakeholders (developers, contractors, turbine manufacturers and Hydro-Québec) to perform testing and commissioning.
    
    
    - Project management
    - Various studies
    - Technical equipment specifications
    - Detailed engineering of substations and collector systems
    - Electrical installations
    - Control and protection supervision
    - Basic engineering for SCADA systems
    - Collector system and electrical substation commissioning
    - Downstream interconnection of the main 315 kV circuit breaker with another existing wind power substation that is very difficult to access
 
        

  

  

 

 1. - 34 2.2 MW wind turbines
    - 75 MW Farm totalling 75 MW
    - 315 kV Connected to a 315 kV Hydro-Québec grid
 
   - [  12 ago 2026 
    
     Four mistakes that can harm the future performance of industrial assets 
    
     
    
     
    
    
    - ![Caroline provost](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/208557/Caroline-provost.webp)   
        
         Caroline Provost P.Eng.
        
        Director, Operational Strategy Implementation
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/four-mistakes-that-can-harm-the-future-performance-of-industrial-assets "Four mistakes that can harm the future performance of industrial assets")
- [  29 jul 2026 
    
     Sachin Jari appointed Principal Director &amp; Head of Commercial Strategy and Business Development 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/news/sachin-jari-appointed-principal-director-head-of-commercial-strategy-and-business-development "Sachin Jari appointed Principal Director & Head of Commercial Strategy and Business Development")
- [  27 jul 2026 Minería y metalurgia  
    
     
    
     Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/las-decisiones-sobre-relaves-definen-desempeno-mina-a-largo-plazo "Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo")
- [  02 jul 2026 Minería y metalurgia  
    
     
    
     Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/python-una-herramienta-clave-para-analisis-datos-en-procesamiento-minerales "Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales")
 
 

       

 

 

   

 Veamos lo  
que podemos  
hacer juntos [ Póngase en contacto con nosotros    

 ](https://www.bbaconsultants.com/es-cl/p%C3%B3ngase-en-contacto-con-nosotros) 

 

   

 1. ## Our experts' solutions
    
    BBA performed the detailed engineering, project management and commissioning of the electrical substation and collector system for the Roncevaux wind farm, a 75 MW power plant composed of 34 wind turbines interconnected to Hydro-Québec’s 315 kV grid. BBA mitigated risks at the site by performing factory acceptance tests (FAT) on control panels and on the protection devices of control buildings.
    
    BBA team members provided the developer with technical support to connect the wind farm to the Hydro-Québec grid while meeting the agreed energization date. Our experts ensure coordination among project stakeholders (developers, contractors, turbine manufacturers and Hydro-Québec) to perform testing and commissioning.
    
    
    - Project management
    - Various studies
    - Technical equipment specifications
    - Detailed engineering of substations and collector systems
    - Electrical installations
    - Control and protection supervision
    - Basic engineering for SCADA systems
    - Collector system and electrical substation commissioning
    - Downstream interconnection of the main 315 kV circuit breaker with another existing wind power substation that is very difficult to access