1. The risks associated with the construction, operation and closure of a Waste Rock Facility (WRF) can be significant. This paper demonstrates the impacts that design, construction and operation can have on the overall risk associated with such facilities. This paper first looks at a facility and its current ongoing operation. This is followed by an evaluation of risk for the proposed LOM configuration, with and without mitigating measures with respect to design, construction and operation. The risks associated with current operations as well as the configuration at closure carried with it a level of risk which the operator found inappropriate. Design, construction and operating recommendations were which reduced risks to acceptable levels. This paper relates the findings of this case study.
    
    Note that this white paper was the subject of a presentation at the Tailings and Mine Waste’18 Conference in Colorado State University.
 
Ce contenu est fourni uniquement à des fins d’information générale. Tous droits réservés ©BBA

 

    1. ![4842](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/176544/4842.webp)   
    
     Zoubir Bouazza, ing., Ph. D.
    
    Ingénieur principal, Sol et infrastructure
    
         [  ](https://www.linkedin.com/in/zoubir-bouazza-64a61165/)
2. ![Luciano Piciacchia](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/3206/Luciano-Piciacchia.webp)   
    
     Luciano Piciacchia, ing., Ph. D.
    
    Expert-conseil senior, Sol et Infrastructure
    
         [  ](https://www.linkedin.com/in/lucianopiciacchia/)
 
 

       

  

  

 

     - [  17 août 2026 
    
     Phase de base de l'ingénierie structurelle: créer de la valeur dès les premières décisions 
    
     
    
     
    
    
    - ![Nicolas Samson](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/197852/Nicolas-Samson.webp)   
        
         Nicolas Samson, ing.
        
        Ingénieur sénior, Structure
     
       
    
     
    
      ](https://www.bbaconsultants.com/fr-ca/perspectives/phase-de-base-ingenierie-structurelle-creer-valeur-des-les-premieres-decisions "Phase de base de l'ingénierie structurelle: créer de la valeur dès les premières décisions")
- [  12 août 2026 
    
     Les quatre erreurs qui nuisent à la performance future d'un actif industriel 
    
     
    
     
    
    
    - ![Caroline provost](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/208557/Caroline-provost.webp)   
        
         Caroline Provost ing.
        
        Directrice, Mise en œuvre de stratégie d’opération
     
       
    
     
    
      ](https://www.bbaconsultants.com/fr-ca/perspectives/quatre-erreurs-qui-nuisent-a-la-performance-future-dun-actif-industriel "Les quatre erreurs qui nuisent à la performance future d'un actif industriel")
- [  27 juill. 2026 Mines et métaux  
    
     
    
     Vos décisions liées aux résidus miniers influencent la performance à long terme 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/fr-ca/perspectives/decisions-liees-aux-residus-miniers-influencent-performance-long-terme "Vos décisions liées aux résidus miniers influencent la performance à long terme")
- [  02 juill. 2026 Mines et métaux  
    
     
    
     Python : un outil clé pour l’analyse des données en traitement des minerais 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/fr-ca/perspectives/python-un-outil-cle-pour-analyse-donnees-en-traitement-minerais "Python : un outil clé pour l’analyse des données en traitement des minerais")
 
 

       

 

 [ Voir tout 

 ](https://www.bbaconsultants.com/fr-ca/perspectives "Aller à la page Publications") 

 

   

 Poussons  
la réflexion  
ensemble [ Contactez-nous    

 ](https://www.bbaconsultants.com/fr-ca/contact) 

 

   

 1. The risks associated with the construction, operation and closure of a Waste Rock Facility (WRF) can be significant. This paper demonstrates the impacts that design, construction and operation can have on the overall risk associated with such facilities. This paper first looks at a facility and its current ongoing operation. This is followed by an evaluation of risk for the proposed LOM configuration, with and without mitigating measures with respect to design, construction and operation. The risks associated with current operations as well as the configuration at closure carried with it a level of risk which the operator found inappropriate. Design, construction and operating recommendations were which reduced risks to acceptable levels. This paper relates the findings of this case study.
    
    Note that this white paper was the subject of a presentation at the Tailings and Mine Waste’18 Conference in Colorado State University.
 
Ce contenu est fourni uniquement à des fins d’information générale. Tous droits réservés ©BBA