-
Benoit Desjardins, P.Eng.
Senior Engineer, Operational Readiness and Commissioning
Publications
-
07 Oct 2025Mining and MetalsPowder engineering as a strategic lever in mineral processing
-
27 Jan 2020Power and RenewablesAdvanced data analysis: What is it and what is it used for?
-
Arbi Bouchoucha, Ph. D.
Advanced Data Analyst
-
-
18 Dec 2019Mining and MetalsTailings disposal: choosing the right technology
-
Guylaine St-Jean, P.Eng.
Senior Engineer, Industrial and Hydro
-
-
11 Dec 2019Power and RenewablesAre you PRC-005-6 compliant ready?
-
04 Dec 2019Power and RenewablesIs SD-WAN for everyone? Almost!
-
Daniel Leblanc
Telecommunications and Networking Analyst
-
-
27 Nov 2019Mining and MetalsIn most cases, when we receive a client database to perform 3D modelling or run an NI43-101 compliant resource estimate (or JORC), the data is incomplete or may contain errors. The following are examples of steps you can take before sending your database to modelling or resource geologists, either internally or to an independent firm to save time.How to properly prepare your data for a mineral resource estimate? -
21 Nov 2019Power and RenewablesEffective mitigation measures for environmental impacts
-
18 Nov 2019Power and RenewablesLoads during construction: what to consider and what methods to use
-
-
13 Nov 2019Power and RenewablesIndustry 4.0 for power plant owners and operators
-
-
12 Nov 2019Power and RenewablesMetal structures near high-voltage power lines: What are the risks?
-
Eric Breault, P.Eng.
Senior Engineer, Electrical - Power Systems, Protection and Control
-
-
05 Nov 2019Power and RenewablesHydro generators: inspecting stator windings-
François St-Germain, P.Eng.
Principal Engineer, Industrial and Hydro
-
-
28 Oct 2019Power and RenewablesShould liquid rheostat drives be considered obsolete?
-
Léo Roy, P.Eng.
Senior Engineer, Electrical
-
-
16 Oct 2019Mining and MetalsIntegrate strategic mine planning
-
Amanda Fitch, P.Eng.
Regional Director, Mining and Metals Market, Western Canada
-
-
14 Oct 2019Power and RenewablesTransformer failure investigation process
-
-
11 Oct 2019Mining and MetalsOptimally manage your mine tailings
-
Luciano Piciacchia, P.Eng., Ph.D.
Senior Consulting Expert, Earth and Infrastructure
-
-
08 Oct 2019Power and RenewablesIn my last blog post entitled ”Operational Readiness and Commissioning Plans: the Key to a Successful Start”, we looked at how BBA gets started with creating an operational readiness and commissioning plan that includes the following seven steps.Operational readiness and commissioning plans: setting up effective controls-
Sylvain Boily, P. Eng., MBA, P.M.P.
Commissioning Manager, Operational Readiness and Commissioning
-
-
03 Oct 2019Power and RenewablesDemystify the integration of new technologies
-
Marc-André Perron, P.Eng.
Director, Management - Digital Power Systems
-
-
01 Oct 2019Power and RenewablesHydro generators: introduction to stator windings
-
François St-Germain, P.Eng.
Principal Engineer, Industrial and Hydro
-
-
23 Sep 2019Other industriesSave time and money when integrating your new systems
-
Mario Côté, P.Eng.
Senior Engineer, Automation
-
-
16 Sep 2019Power and RenewablesAlarm rationalization: a guide for quick wins!
-
Maxym Lachance, P.Eng.
Senior Engineer, Process Control and Operational Technology
-
-
04 Sep 2019Power and RenewablesMedium and high-voltage electrical equipment found in substations and industrial facilities need DC power in order to provide uninterrupted power to emergency systems, to protection devices and, in some cases, to computer systems and programmable logic controllers (PLCs). If a power outage occurs, batteries can reliably supply uninterrupted DC power that is independent of your AC power system.Stationary batteries: Will yours work when you need them?-
Dominic Dubreuil, P.Eng.
Electrical Engineer
-
-
04 Sep 2019Power and RenewablesThe challenges of integrating renewable energy sources into off-grid power systems
-
Stéphan Landry, P.Eng.
Principal Engineer, Electrical - Power Generation and Apparatus
-
-
15 Aug 2019Power and RenewablesIntegrating a renewable energy source into mining: six key steps
-
Jean-Philippe Castonguay, P.Eng.
Director - Off-Grid Hybrid Power & Energy Storage
-
-
09 Aug 2019Power and RenewablesSupporting indigenous communities with environmental management plans
-
Vincent Clément, P.Biol., RP.Bio., QAES
Senior Environmental Professional
-
-
05 Aug 2019Power and RenewablesDo you need advanced control?
-
Michel Ruel, P.Eng.
Expert, Process Control
-
-
22 Jul 2019Mining and MetalsSlurry pumping and transportation is a complex process that requires specialized knowledge, comprehensive testwork and collaboration with third parties, such as pump suppliers. Here is an overview of the important components to consider when sizing systems and selecting equipment.Slurry engineering: what to consider-
Roman Dorfman, P.Eng.
Principal Engineer, Piping
-
-
05 Jul 2019Power and RenewablesPromoting environmental and social compliance of your projects
-
Vincent Clément, P.Biol., RP.Bio., QAES
Senior Environmental Professional
-
-
03 Jul 2019Power and RenewablesDigital power systems
-
-
02 Jul 2019Mining and MetalsStructural expertise in ore loading pockets
-
-
27 Jun 2019Energy and chemical processesProven methods for reducing sulfur dioxide (SO2) emissions
-
Joe Nava, P.Eng.
Global Director, Advanced Fuels and Chemicals
-
-
14 Jun 2019Power and RenewablesOne of the biggest challenges to tackle when adopting and integrating new digital technology is knowing where to start. There are so many buzzwords, concepts and technologies when it comes to Industry 4.0 that you need to take a step back when selecting the best solutions for your business.Integrating digital technology: Ready, set, go!-
Marc-André Perron, P.Eng.
Director, Management - Digital Power Systems
-