Insights
-
01 Jun 2026In some projects, the main challenge isn’t technical complexity. It’s the schedule. When schedules become critical, engineering teams need to shift their mindset: make decisions earlier, accept uncertainty and rely on shared performance. As such, engineering becomes a process of making choices, striking compromises and managing risks, both technical and human. Below are three key questions addressed by Hugo Careau, P.Eng., Decarbonization, and Ulric Chayer, P.Eng., Department Manager, Mechanical Engineering.When the schedule is the client’s top priority
-
11 Apr 2019Power and RenewablesManaging power system harmonics for underground mines
-
Stéphan Landry, P.Eng.
Principal Engineer, Electrical - Power Generation and Apparatus
-
-
08 Apr 2019Power and RenewablesWT steel: When should you use it?
-
Monika Rybarova, P.Eng., M.A.Sc., P.M.P.
Principal Engineer, Structural
-
-
08 Apr 2019Power and RenewablesOptimize conception with constructability
-
Vincent Hudon, P.Eng.
Department Manager, Construction
-
-
02 Apr 2019Power and RenewablesOperational readiness and commissioning plans: the key to a successful start
-
Sylvain Boily, P. Eng., MBA, P.M.P.
Commissioning Manager, Operational Readiness and Commissioning
-
-
25 Mar 2019Power and RenewablesIn a context marked by unprecedented connectivity and the proliferation of sensors, it’s becoming a growing challenge to manage production data for industrial businesses. Data is often collected based on the needs of individuals and lacks a general plan. It accumulates at such a rate that it becomes more and more difficult to valuate. Additionally, the lack of a strategy can create an imbalance between the resources dedicated to managing IT infrastructures and the gains in using the data. On the other hand, strategic data management enables businesses to make good use of it and gain valuable information.The importance of having a strategy to manage production data-
Jean-François Beaulieu
Director, Digital Consultant
-
-
14 Mar 2019Power and RenewablesMeeting environmental compliance and gaining social licensing
-
Vincent Clément, P.Biol., RP.Bio., QAES
Senior Environmental Professional
-
-
07 Mar 2019Power and RenewablesOptimize production ramp-up through operational readiness
-
Nicolas Beauchamp, P.Eng.
Commissioning Manager, Operational Readiness and Commissioning
-
-
28 Feb 2019Power and RenewablesBusiness analysis: an essential tool for successfully implementing your IT projects
-
Julie Lessard
Senior Business Analyst, Operational Technology and Infrastructure
-
-
25 Feb 2019Power and RenewablesStrategic asset management planning (SAMP) in major industrial electrical networks
-
Pierre Girard, P.Eng.
National Practice Leader, Electrical
-
-
22 Feb 2019Energy and chemical processesThe application of numerical modelling in efficiency-driven designs: ventilation problem-
Lyne Ricard, P.Eng.
Senior Consulting Expert, Advanced Fuels and Chemicals
-
-
21 Feb 2019Power and RenewablesOptimizing the design of penstock manifold with 3D computational fluid dynamics (CFD) simulation
-
21 Feb 2019Mining and MetalsHow to get rid of errors in your drilling database in 25 questions
-
19 Dec 2018Mining and MetalsEverything you need to know about atmospheric modelling
-
David Giard, P.Eng., M.Sc.
Senior Engineer, Environmental Engineering
-
-
18 Dec 2018Power and RenewablesWind farms: noise challenges
-
12 Dec 2018Power and RenewablesKaplan turbines offer the advantage of being able to operate with a relatively high level of efficiency over a wide range of flows and net heads. But this flexibility comes with a high‑pressure oil circuit that wears out over time and increasingly leaks oil, resulting in pressure losses. Reduced pressure in the hydraulic system that controls the runner blade servomotor can lead to a variety of maintenance problems, including shifts away from the optimum blade correlation (optimum correlation of guide vane vs. runner blade openings, depending on the head), resulting in a loss of performance and profitability.Addressing pressure loss and oil leakage in Kaplan turbines and the impact on efficiency-
François St-Germain, P.Eng.
Principal Engineer, Industrial and Hydro
-
-
03 Dec 2018Power and RenewablesGeomatics and surveying: essential engineering tools
-
Marie-France Proulx, P.Eng., M.A.Sc., P.M.P.
Senior Engineer, Earth and Infrastructure
-
-
28 Nov 2018Mining and MetalsUsing speed variation for pumps
-
Roman Dorfman, P.Eng.
Principal Engineer, Piping
-
-
27 Nov 2018Power and RenewablesBudgeting tips for engineering project management
-
Marie Chiasson, P.Eng.
Practice Leader, Engineering Management
-
-
02 Nov 2018Mining and MetalsThe use of 3D models and analysis in support of waste stockpile design and operations
-
-
02 Nov 2018Mining and MetalsPractical nomograms for waste rock piles design on competent foundations -
-
02 Nov 2018Mining and MetalsMine waste rock storage facilities design, construction and operation as engineered structures
-
-
02 Nov 2018Mining and MetalsAssessment of design and operating practices on the risks associated with waste rock stockpiles
-
-
02 Nov 2018Mining and MetalsGuidance for the safe and optimized operation of waste rocks facilities
-
-
23 Oct 2018Power and RenewablesUnderstanding, quantifying and correcting noise sources
-
06 Jul 2018Power and RenewablesHow can a manager or supervisor address a control system performance issue? Do control loops provide value for money? We suggest a three-step approach to answer these fundamental questions and suggest a few aspects to consider at each step.Control system performance: Which figures should be considered?-
Michel Ruel, P.Eng.
Expert, Process Control
-
-
06 Jul 2018Power and RenewablesEverything you need to know about arc-flash hazard analyses
-
Joel Sourceaux, P.Eng.
Principal Engineer, Electrical - Power Systems, Protection and Control
-
-
06 Jul 2018Power and RenewablesCommissioning and maintenance of electrical distribution equipment: which approach to adopt
-
Dominic Dubreuil, P.Eng.
Electrical Engineer
-
-
05 Jul 2018Mining and MetalsImplementing an industrial mining project: noise challenges
-
05 Jul 2018Power and RenewablesPower grid protection... don't wing it!
-
Rémi Hallé, P.Eng.
Senior Engineer, Electrical - Power Systems, Protection and Control
-
-
05 Jul 2018Power and RenewablesThis post reviews the evolution of challenges managers of major industrial facilities who operate large power systems have to face regarding workforce expertise. It also provides an overview of today’s options.Workforce challenges in industrial electrical facilities-
Pierre Girard, P.Eng.
National Practice Leader, Electrical
-