Colo-D is a North American leader in colocation data centre solutions. In fact, by adding its second data centre in the greater metropolitan region of Montréal in 2016, it became the largest provider of colocation services in Québec.

 

- Region Eastern Canada
- Client  COLO-D
 
 

 

 

   1. ## Our experts' solutions
    
    In 2014, BBA participated in building and expanding COLO-D’s first 20 MW data centre in Drummondville. The company mandated BBA again to perform the electrical design of their second data centre, with a 35 MW capacity, in Longueuil. In both instances, BBA’s mandate included designing and commissioning the centre’s 25 kV input, the critical low-voltage supply system, emergency generators and uninterruptible power supply (UPS) units.
    
    
    - TIER III (Uptime Institute) data centre design
    - Cutting-edge expertise in electrical design as well as critical networks and redundancy
    - Met tight deadlines, despite project complexity and high technical requirements
 
   

  

 

 1. > BBA has accredited experts in data centre design, which lends great credibility in the market.
    
     Yves Bétournay, ATD
2. - 55 MW combined capacity
    - 300,000 Total area of 300,000 square feet
    - Second largest colocation data centre provider in Canada
 
   - [  29 Jul 2026 
    
     Sachin Jari appointed Principal Director &amp; Head of Commercial Strategy and Business Development 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-us/news/sachin-jari-appointed-principal-director-head-of-commercial-strategy-and-business-development "Sachin Jari appointed Principal Director & Head of Commercial Strategy and Business Development")
- [  27 Jul 2026 Mining and Metals  
    
     
    
     Early tailings decisions shape long-term mine performance 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-us/insights/early-tailings-decisions-shape-long-term-mine-performance "Early tailings decisions shape long-term mine performance")
- [  02 Jul 2026 Mining and Metals  
    
     
    
     Python: A key tool for data analysis in mineral processing 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-us/insights/python-a-key-tool-for-data-analysis-in-mineral-processing "Python: A key tool for data analysis in mineral processing")
- [  02 Jul 2026 
    
     Stéphanie Turbide appointed Office Director, Mont-Saint-Hilaire 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-us/news/stephanie-turbide-appointed-office-director-mont-saint-hilaire "Stéphanie Turbide appointed Office Director, Mont-Saint-Hilaire")
 
 

       

 

 

   

 Let’s see what  
we can do  
together [ Contact us    

 ](https://www.bbaconsultants.com/en-us/contact) 

 

   

 1. ## Our experts' solutions
    
    In 2014, BBA participated in building and expanding COLO-D’s first 20 MW data centre in Drummondville. The company mandated BBA again to perform the electrical design of their second data centre, with a 35 MW capacity, in Longueuil. In both instances, BBA’s mandate included designing and commissioning the centre’s 25 kV input, the critical low-voltage supply system, emergency generators and uninterruptible power supply (UPS) units.
    
    
    - TIER III (Uptime Institute) data centre design
    - Cutting-edge expertise in electrical design as well as critical networks and redundancy
    - Met tight deadlines, despite project complexity and high technical requirements