Data centre substation project

  • Project
Effet ingeniosite Data Centers Canva

As part of the expansion of a large-scale data centre campus, BBA supported the design of a new digitalized electrical substation to accommodate increased power requirements while maintaining high standards for reliability and operational resilience.

  • Date Jan 01, 2024
  • Region Eastern Canada
  • Client Confidential
  1. Our experts' solution

    BBA's contribution 

    • Design of resilient electrical infrastructure for a mission-critical environment 
    • Integration of redundant electrical and digital systems 
    • Implementation of advanced monitoring and control capabilities 
    • Testing and preconfiguration of control and communication equipment 
    • Flexible engineering approach allowing equipment adjustments throughout the project 

    Strategic impact 

    The project demonstrates how advanced digital substation design can contribute to more efficient, resilient and adaptable electrical infrastructure for mission-critical facilities.