-
Benoit Desjardins, P.Eng.
Senior Engineer, Operational Readiness and Commissioning
Publications
-
07 Oct 2025Mining and MetalsThe race to electrify, miniaturize technologies and decarbonize industrial processes is fuelling growing demand for high value-added materials. At the heart of this transformation is powder engineering.Powder engineering as a strategic lever in mineral processing
-
03 Dec 2018Power and RenewablesGeomatics and surveying: essential engineering tools
-
Marie-France Proulx, P.Eng., M.A.Sc., P.M.P.
Senior Engineer, Earth and Infrastructure
-
-
28 Nov 2018Mining and MetalsUsing speed variation for pumps
-
Roman Dorfman, P.Eng.
Principal Engineer, Piping
-
-
27 Nov 2018Power and RenewablesBudgeting tips for engineering project management
-
Marie Chiasson, P.Eng.
Practice Leader, Engineering Management
-
-
02 Nov 2018Mining and MetalsThe use of 3D models and analysis in support of waste stockpile design and operations
-
-
02 Nov 2018Mining and MetalsPractical nomograms for waste rock piles design on competent foundations -
-
02 Nov 2018Mining and MetalsMine waste rock storage facilities design, construction and operation as engineered structures
-
-
02 Nov 2018Mining and MetalsAssessment of design and operating practices on the risks associated with waste rock stockpiles
-
-
02 Nov 2018Mining and MetalsGuidance for the safe and optimized operation of waste rocks facilities
-
-
23 Oct 2018Power and RenewablesUnderstanding, quantifying and correcting noise sources
-
06 Jul 2018Power and RenewablesHow can a manager or supervisor address a control system performance issue? Do control loops provide value for money? We suggest a three-step approach to answer these fundamental questions and suggest a few aspects to consider at each step.Control system performance: Which figures should be considered?-
Michel Ruel, P.Eng.
Expert, Process Control
-
-
06 Jul 2018Power and RenewablesEverything you need to know about arc-flash hazard analyses
-
Joel Sourceaux, P.Eng.
Principal Engineer, Electrical - Power Systems, Protection and Control
-
-
06 Jul 2018Power and RenewablesCommissioning and maintenance of electrical distribution equipment: which approach to adopt
-
Dominic Dubreuil, P.Eng.
Electrical Engineer
-
-
05 Jul 2018Mining and MetalsImplementing an industrial mining project: noise challenges
-
05 Jul 2018Power and RenewablesPower grid protection... don't wing it!
-
Rémi Hallé, P.Eng.
Senior Engineer, Electrical - Power Systems, Protection and Control
-
-
05 Jul 2018Power and RenewablesThis post reviews the evolution of challenges managers of major industrial facilities who operate large power systems have to face regarding workforce expertise. It also provides an overview of today’s options.Workforce challenges in industrial electrical facilities-
Pierre Girard, P.Eng.
National Practice Leader, Electrical
-
-
05 Jul 2018Power and RenewablesBBA's equipment and systems testing process
-
Pierre Girard, P.Eng.
National Practice Leader, Electrical
-
-
17 May 2018Energy and Chemical ProcessesMajor incidents: corrective actions for "never again!"
-
Lyne Ricard, P.Eng.
Senior Consulting Expert, Advanced Fuels and Chemicals
-
-
06 May 2018Power and RenewablesIndustry 4.0 or a new wave in an industrial environment
-
Michel Ruel, P.Eng.
Expert, Process Control
-
-
04 May 2018Power and RenewablesPower generating stations: a wealth of opportunity
-
-
11 Jan 2018Power and RenewablesIf you’ve been hibernating for the last two years, you’re waking up to a shockingly different renewable price environment. In your mind, PPAs for wind energy under $40/MWh in North America were forecasted for 2030 and beyond. I understand your confusion. If you want your renewable projects that are currently under development to stand a chance in this new era, you must master all aspects of your project development process and consider the interconnection aspects right from the origination. The key mindsets are: be frugal, be strategic and be shrewd. Interconnection is now considered by developers’ community to be as important as resources, financing and social and environmental licensing.Interconnection: 3 things renewable developers should know -
05 Dec 2017Power and RenewablesThe benefits of witnessing electrical factory acceptance tests (FATS)
-
Maurice Brisson, P.Eng., M.A.Sc.
Senior Consulting Expert, Power System Planning
-
-
06 Oct 2017Power and RenewablesRevisiting electrical energy saving initiatives for industrial facilities
-
Aaron Mc Loughlan
Electrical Engineer-in-Training (EIT)
-
-
05 Jul 2017Other industriesCombustible dust: managing explosion hazards more effectively – Part 2
-
Hugues Châteauneuf, P.Eng.
Senior Consulting Expert, Ventilation, Hazardous Locations, Explosion Hazards
-
-
05 Jul 2017Power and RenewablesIs your control system ground in good working condition?
-
Pierre Girard, P.Eng.
National Practice Leader, Electrical
-
-
15 Jun 2017Other industriesCriteria for data centre location-
Yves Bétournay, P.Eng.
Senior Engineer, Electrical - Power Generation and Apparatus
-
-
06 Jun 2017Power and RenewablesArc-flash hazard on direct current (DC) systems
-
06 Jun 2017Mining and MetalsDesign and mining simulations
-
-
12 May 2017Power and RenewablesWhat everyone should know about hydraulic balancing
-
François St-Germain, P.Eng.
Principal Engineer, Industrial and Hydro
-
-
09 Mar 2017Power and RenewablesThe challenge of refurbishing hydroelectric generating stations
-
22 Sept 2016Power and RenewablesGenerating electricity using off-grid systems in remote areas is expensive and involves significant procurement and operational challenges. Optimizing the use of energy sources reduces fuel consumption, which has a direct impact on the environment.Off-grid hybrid systems through adaptive power setpoints-
Stéphan Landry, P.Eng.
Principal Engineer, Electrical - Power Generation and Apparatus
-