Hydro-Québec Production wanted to perform an arc flash hazard assessment in electrical facilities (AC and DC) for 62 power plants. This project was part of an initiative to ensure the safety of personnel working near electrical facilities and to comply with ULC-S801 and CSA Z462 standards.

 

- Region Eastern Canada
- Client  Hydro-Québec
 
 

 

 

   1. ## Our experts' solutions
    
    Because Hydro-Québec requires a high degree of accuracy, BBA worked closely with the client to produce a calculation method that included the decay effect of generator sets during a fault.
    
    BBA used ETAP software for this mandate, so, as a result, our experts trained Hydro-Québec staff to use it.
    
    
    - Proposed a methodology to assess the incident energy that included the fault current decay of generator sets.
    - Performed a short-circuit study and determined protection settings on high-, medium- and low-voltage facilities to assess arc duration.
    - Performed an arc flash hazard analysis with existing protection settings.
    - Developed risk analysis tables showing the settings prescribed by the standards for each work location (limit perimeter, work distances and thermal resistance of personal protective equipment).
 
        

  

  

 

 1. > In addition to bolstering the safety of Hydro-Québec Production workers during this mandate, we had the opportunity to train them and provide technical support to study engineers to ensure their autonomy in assessing arc flash hazards in electrical facilities.
    
     Joël Sourceaux, Expert, Power Systems Studies, BBA
 
   - [  29 Jul 2026 
    
     Sachin Jari appointed Principal Director &amp; Head of Commercial Strategy and Business Development 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/news/sachin-jari-appointed-principal-director-head-of-commercial-strategy-and-business-development "Sachin Jari appointed Principal Director & Head of Commercial Strategy and Business Development")
- [  27 Jul 2026 Mining and Metals  
    
     
    
     Early tailings decisions shape long-term mine performance 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/early-tailings-decisions-shape-long-term-mine-performance "Early tailings decisions shape long-term mine performance")
- [  02 Jul 2026 Mining and Metals  
    
     
    
     Python: A key tool for data analysis in mineral processing 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/python-a-key-tool-for-data-analysis-in-mineral-processing "Python: A key tool for data analysis in mineral processing")
- [  02 Jul 2026 
    
     Stéphanie Turbide appointed Office Director, Mont-Saint-Hilaire 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/news/stephanie-turbide-appointed-office-director-mont-saint-hilaire "Stéphanie Turbide appointed Office Director, Mont-Saint-Hilaire")
 
 

       

 

 

   

 Let’s see what  
we can do  
together [ Contact us    

 ](https://www.bbaconsultants.com/en-ca/contact) 

 

   

 1. ## Our experts' solutions
    
    Because Hydro-Québec requires a high degree of accuracy, BBA worked closely with the client to produce a calculation method that included the decay effect of generator sets during a fault.
    
    BBA used ETAP software for this mandate, so, as a result, our experts trained Hydro-Québec staff to use it.
    
    
    - Proposed a methodology to assess the incident energy that included the fault current decay of generator sets.
    - Performed a short-circuit study and determined protection settings on high-, medium- and low-voltage facilities to assess arc duration.
    - Performed an arc flash hazard analysis with existing protection settings.
    - Developed risk analysis tables showing the settings prescribed by the standards for each work location (limit perimeter, work distances and thermal resistance of personal protective equipment).