Our experts' solutions
From the start of this project, BBA experts worked in partnership with the client to identify the best technical solutions that would optimize costs and facilitate the construction of the Tretheway Creek power plant. BBA was therefore involved from the feasibility study phase to the detailed engineering in design-build mode.
The project had an expected power capacity of 21.2 MW and consisted of building 4.6 km of penstock, varying from 1.7 m to 2.1 m in diameter, coming from a power plant powered by two Pelton turbines with a nominal flow rate of 11.4 m³/s, a 263-metre hydraulic head and a tailrace.
- Consideration of natural obstacles during the design phase to reduce excavation costs and curb the environmental footprint
- Installation of soil restraint was used to minimize the use of concrete anchor blocks on the buried section of the penstock (4.4 km).
- Innovative building design, built on a 20 m x 50 m projection, in a rock excavation at the foot of a steep, 200 m slope.
- Optimization of the penstock pass over a 5 km territory of mountainous topography
- Optimization of 200 km of penstock installed on pedestals
- Mapping streams and potential landslides
- Project cost reduction of nearly $8M