TransAlta is recognized for its active participation in designing renewable energy projects across Canada. For the New Richmond project, the company had to commit to extremely ambitious construction and interconnection schedules to meet Hydro-Québec requirements. What was a stake? Powering Québec homes with wind-generated electricity.

 

- Region Eastern Canada
- Client  Venterre NRG (wholly owned by TransAlta Corporation)
 
 

 

 

   1. ## Our experts' solutions
    
    The team came together quickly and developed an innovative delivery strategy enabling the paralleling of design and procurement activities while optimizing prefabrication and minimizing rework. Results spoke for themselves, a project energized as planned that now displays one of the highest facility availability rate in the industry.
    
    The mandate was executed respecting a schedule compressed by five months for the electrical and civil design along major procurement activities.
    
    
    - Interconnection and electrical studies
    - Detailed engineering – civil, electrical and automation
    - Compliance with the IEC 61850 standard
    - Design and implementation of the SCADA system
    - Construction supervision of civil and electrical work
    - Testing and energization of all systems
 
        

  

  

 

 1. > The BBA team was able to bond seamlessly with the TransAlta team and was instrumental in fast tracking our project’s acceptance by Hydro-Québec for interconnection. BBA experts also brought hands-on expertise and were by our side, from design to energization.
    
     Julie Turgeon, Project Manager, TransAlta
2. - 33 E82, 2 MW and 2.3 MW wind turbines
    - 67.8 MW Wind farm totalling 67.8 MW
    - 230kV Wind farm connected to the Hydro-Québec 230kV grid
    - 11,000 Powering 11,000 Homes
    - Highest facility availability rate of its fleet
 
   - [  29 Jul 2026 
    
     Sachin Jari appointed Principal Director &amp; Head of Commercial Strategy and Business Development 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/news/sachin-jari-appointed-principal-director-head-of-commercial-strategy-and-business-development "Sachin Jari appointed Principal Director & Head of Commercial Strategy and Business Development")
- [  27 Jul 2026 Mining and Metals  
    
     
    
     Early tailings decisions shape long-term mine performance 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/early-tailings-decisions-shape-long-term-mine-performance "Early tailings decisions shape long-term mine performance")
- [  02 Jul 2026 Mining and Metals  
    
     
    
     Python: A key tool for data analysis in mineral processing 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/python-a-key-tool-for-data-analysis-in-mineral-processing "Python: A key tool for data analysis in mineral processing")
- [  02 Jul 2026 
    
     Stéphanie Turbide appointed Office Director, Mont-Saint-Hilaire 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/news/stephanie-turbide-appointed-office-director-mont-saint-hilaire "Stéphanie Turbide appointed Office Director, Mont-Saint-Hilaire")
 
 

       

 

 

   

 Let’s see what  
we can do  
together [ Contact us    

 ](https://www.bbaconsultants.com/en-ca/contact) 

 

   

 1. ## Our experts' solutions
    
    The team came together quickly and developed an innovative delivery strategy enabling the paralleling of design and procurement activities while optimizing prefabrication and minimizing rework. Results spoke for themselves, a project energized as planned that now displays one of the highest facility availability rate in the industry.
    
    The mandate was executed respecting a schedule compressed by five months for the electrical and civil design along major procurement activities.
    
    
    - Interconnection and electrical studies
    - Detailed engineering – civil, electrical and automation
    - Compliance with the IEC 61850 standard
    - Design and implementation of the SCADA system
    - Construction supervision of civil and electrical work
    - Testing and energization of all systems