Parachem Chemicals is the only Canadian manufacturer of paraxylene, an aromatic hydrocarbon in the polyester production chain used to manufacture clothing and plastic bottles, among other items. The company wanted to perform a hazard and operability (HAZOP) risk analysis for its paraxylene crystallization process. The purpose of the analysis was essentially to identify problematic operation and maintenance issues.

 

- Region Eastern Canada
- Client  Parachem Chemicals
 
 

 

 

   1. ## Our experts' solutions
    
    BBA was awarded the mandate and used the Parachem Chemicals risk matrix to perform the analysis. This analysis covered the crystallization unit, with the exception of the ethylene and propane gas refrigeration unit. All the unit’s crystallization trains had to be analyzed. As for refrigeration, only the elements present in the crystallizer piping and instrumentation diagrams were assessed.  
      
    The risk analysis identified risks in a standardized method, in compliance with the CAN/CSA-Z767-17 Process Safety Management standard. It was performed after nine meetings with the plant’s technical, operational and maintenance personnel. BBA hosted the meetings and recorded notes in PHA-Pro software. A total of 36 piping and instrumentation diagrams were reviewed during the meetings.
 
        

  

  

 

 1. - 36 Review of 36 piping and instrumentation diagrams
    - CAN/CSA-Z767-17 Compliance with the CAN/CSA-Z767-17 standard
 
   - [  29 Jul 2026 
    
     Sachin Jari appointed Principal Director &amp; Head of Commercial Strategy and Business Development 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/news/sachin-jari-appointed-principal-director-head-of-commercial-strategy-and-business-development "Sachin Jari appointed Principal Director & Head of Commercial Strategy and Business Development")
- [  27 Jul 2026 Mining and Metals  
    
     
    
     Early tailings decisions shape long-term mine performance 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/early-tailings-decisions-shape-long-term-mine-performance "Early tailings decisions shape long-term mine performance")
- [  02 Jul 2026 Mining and Metals  
    
     
    
     Python: A key tool for data analysis in mineral processing 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/python-a-key-tool-for-data-analysis-in-mineral-processing "Python: A key tool for data analysis in mineral processing")
- [  02 Jul 2026 
    
     Stéphanie Turbide appointed Office Director, Mont-Saint-Hilaire 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/news/stephanie-turbide-appointed-office-director-mont-saint-hilaire "Stéphanie Turbide appointed Office Director, Mont-Saint-Hilaire")
 
 

       

 

 

   

 Let’s see what  
we can do  
together [ Contact us    

 ](https://www.bbaconsultants.com/en-ca/contact) 

 

   

 1. ## Our experts' solutions
    
    BBA was awarded the mandate and used the Parachem Chemicals risk matrix to perform the analysis. This analysis covered the crystallization unit, with the exception of the ethylene and propane gas refrigeration unit. All the unit’s crystallization trains had to be analyzed. As for refrigeration, only the elements present in the crystallizer piping and instrumentation diagrams were assessed.  
      
    The risk analysis identified risks in a standardized method, in compliance with the CAN/CSA-Z767-17 Process Safety Management standard. It was performed after nine meetings with the plant’s technical, operational and maintenance personnel. BBA hosted the meetings and recorded notes in PHA-Pro software. A total of 36 piping and instrumentation diagrams were reviewed during the meetings.