In industrial environments, managing dust—including combustible dust—is a real health and safety challenge that must be taken very seriously, as with noise management. A client from the metals sector wanted to improve air quality for workers inhaling it and manage risks to their safety due to the explosive nature of ambient dust.

 

- Region Multiple sites across Canada
- Client  Confidential
 
 

 

 

   1. ## Our experts' solutions
    
    In only a few weeks, BBA led a preliminary study to optimize the existing dust collection system, in addition to carrying out the detailed engineering, coordinating component manufacturing and commissioning the system, while working closely with the onsite contractor and the client. Our experts were subsequently called upon to review the company’s practices in managing sources of combustible dust emissions.
    
    BBA took advantage of the mandate to lower noise levels from 92 dB to 77 dB, providing a safer work environment for client personnel.
    
    
    - Measured air flow
    - Modified dust collection hoods and ducts
    - Designed insulation to offset the risk of flames spreading (explosive dust management)
    - Managed construction
 
        

  

  

 

 1. > By questioning the client’s clever solution, we were able to shorten project delivery deadlines, reduce costs and, consequently, noise levels.
    
     Yves Sasseville, Engineer, BBA
 
   - [  29 Jul 2026 
    
     Sachin Jari appointed Principal Director &amp; Head of Commercial Strategy and Business Development 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/news/sachin-jari-appointed-principal-director-head-of-commercial-strategy-and-business-development "Sachin Jari appointed Principal Director & Head of Commercial Strategy and Business Development")
- [  27 Jul 2026 Mining and Metals  
    
     
    
     Early tailings decisions shape long-term mine performance 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/early-tailings-decisions-shape-long-term-mine-performance "Early tailings decisions shape long-term mine performance")
- [  02 Jul 2026 Mining and Metals  
    
     
    
     Python: A key tool for data analysis in mineral processing 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/python-a-key-tool-for-data-analysis-in-mineral-processing "Python: A key tool for data analysis in mineral processing")
- [  02 Jul 2026 
    
     Stéphanie Turbide appointed Office Director, Mont-Saint-Hilaire 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/news/stephanie-turbide-appointed-office-director-mont-saint-hilaire "Stéphanie Turbide appointed Office Director, Mont-Saint-Hilaire")
 
 

       

 

 

   

 Let’s see what  
we can do  
together [ Contact us    

 ](https://www.bbaconsultants.com/en-ca/contact) 

 

   

 1. ## Our experts' solutions
    
    In only a few weeks, BBA led a preliminary study to optimize the existing dust collection system, in addition to carrying out the detailed engineering, coordinating component manufacturing and commissioning the system, while working closely with the onsite contractor and the client. Our experts were subsequently called upon to review the company’s practices in managing sources of combustible dust emissions.
    
    BBA took advantage of the mandate to lower noise levels from 92 dB to 77 dB, providing a safer work environment for client personnel.
    
    
    - Measured air flow
    - Modified dust collection hoods and ducts
    - Designed insulation to offset the risk of flames spreading (explosive dust management)
    - Managed construction