Our experts' solutions
BBA engineers worked closely with client personnel to identify the causes of these problems and find optimal solutions. After analyzing the proposed options, the client decided to replace the existing furnaces with new ones capable of handling condensation.
The work was carried out by a multidisciplinary team with the following expertise: processes, mechanical and piping, electrical and automation, civil and structural.
- Validated design capacities and required operating conditions
- Identified connection points with existing facilities (piping, electrical installations, instrumentation, automation)
- Performed test procedure for the new piping
- Designed modifications and interconnections (piping, electrical and automation)
- Performed engineering and modified input/output drawings (electrical and AIT) and new drawings for electrical distribution
- Provided network architecture drawings
- Integrated new boilers into the process control procedure
- Modified programming
- Dismantled control logic from old boilers
- Tested communications and validated electrical equipment for new boilers at the supplier
- Pre-operational verification and commissioning