Our experts' solutions
BBA was mandated to develop conceptual approaches aimed at aligning short-, medium- and long-term construction of waste rock piles with current legislation. The plans, which were designed using 3D modelling, included creating a strategic berm to retain waste rock and ensuring that the company respected the area planned for waste rock. The approach optimized the use of lower cost descending construction methods while ensuring compliance of the final structure.
The proposed solutions bring pile stability in line with legislative requirements and thus improve environmental risk management. The suggested berm construction was composed entirely of the mine’s waste rock, and all access roads were built into the berms themselves thus reducing project costs.