Our experts' solution
Several years ago, the plant’s production server was used for a vast number of tasks. Many processes depended on this system, which caused a single point of failure and therefore a real risk to the plant operating properly.
This mandate involved a range of challenges. In addition to the varied and complex ramifications, the server had to be replaced while the plant was still in continuous production and with only one weekend of complete shutdown. The proposed solution also had to meet internal IT infrastructure standards.
BBA experts designed a server migration plan that was reviewed by all stakeholders. In addition to the technological aspect, it included a change management and communication plan, as well as a rollback plan.
They also set up a testbed of the systems to be migrated to test the proposed solution in a real-world setting.
Work performed:
- Reverse engineered applications and transactions
- Developed the software migration plan
- Developed the transactional migration plan
- Developed the rollback plan
- Developed the change management and communication plan