title: Woodworth Dam
date: 2023-03-01T10:57:00-05:00
author: Caroline Lemire Gaumont
canonical_url: "https://www.bbaconsultants.com/en-ca/projects/woodworth-dam"
section: Projects
---
Austin Engineering, now known as BBA, was tasked with replacing the Woodworth Dam in Prince Rupert. The dam as well as the water supply lines were aging (over 100 years old) and needed to be replaced. The city called upon BBA to optimize the dam redesign and make it the main source of freshwater for the city, while keeping costs as low as possible.

 Awards and Recognition- ACEC-BC 2023 Award of Excellence
- ACEC-BC 2023 Lieutenant Governor’s Award
 
 

- Date Oct 22, 2022
- Region Western Canada
- Client  City of Prince Rupert
- [ Case study    
    
     ](https://www.assets.bbaconsultants.com/bba-production-assets/production/documents/pdf/BBA_Case-study_Prince-Rupert_Woodworth_Dam_EN.pdf "Download PDF of our case study")
 
 

 

 

   1. ## Our experts' solutions
    
    When revising the initial design, our engineers compared several models using an innovative process: the dams were 3D printed, the riverbeds were CNC routed, and they were all tested in hydraulic flumes to confirm their flow characteristics. Realistic model structures were used to communicate the new design to stakeholders in a visual way. This approach allowed our team to optimize the initial Woodworth Dam design while significantly decreasing the project budget (by nearly 17%).
2. - [  ![BBA_WoodWorthDam_Project](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/_size_squared/132012/5_BBA_WoodWorth_Dam_ACEC-BC.webp) Realistic model structures were used to communicate the new design to stakeholders in a visual and interactive way.  ](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/5_BBA_WoodWorth_Dam_ACEC-BC.jpg)
    - [  ![BBA_WoodWorthDam_3dprinting_Project](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/_size_squared/132042/3_BBA_WoodWorth_Dam_ACEC-BC.webp) The innovative 3D printing approach reduced the concrete, rock anchor volume and excavations.  ](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/3_BBA_WoodWorth_Dam_ACEC-BC.jpg)
3. The new structure, a 15-metre-high concrete gravity dam, was built downstream from the existing dam, in a rocky canyon, and should ensure a stable water supply for the next 50 to 100 years.
    
    Since Prince Rupert is known for its significantly heavy rainfalls, BBA also took care to predict and allow for future changes in flow regimes within the river system as a result of climate change. The spillway capacity was oversized to allow for future flood flows and demands.
    
    Best environmental and dam safety practices were implemented throughout the project to ensure its sustainability.
4. [  ![BBA_WoodWorthDam_Project](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/1_BBA_WoodWorth_Dam_ACEC-BC.jpg) Dam safety best practices: the overall dam was designed to be overtopped entirely during a flood event.  ](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/1_BBA_WoodWorth_Dam_ACEC-BC.jpg)
5. Since the Woodworth Dam is located on First Nations land, the communities were involved throughout the project to ensure that special attention and care was taken to respect the location and their culture.
    
    The completion and commissioning of the Woodworth Dam were celebrated on October 14, 2022. It now allows water to be taken directly from the Woodworth Reservoir and piped by a high-density polyethylene pipeline down and across the harbour, entering the City of Prince Rupert’s water system.
6. - [  ![BBA_Woodworthdam_Cedar_Project](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/_size_squared/132088/20220901_083621.webp) Preservation of a significant First Nations cultural symbol: the ceremonial cedar tree  ](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/20220901_083621.jpg)
    - [  ![BBA_WoodworthDam_Celebratory_Project](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/_size_squared/132105/4_BBA_Woodworth_Dam_ACEC-BC-_INCLUDE_PHOTO_CREDIT_City-of-Prince-Rupert.webp) Oct. 14, 2022 – A celebratory delegation of more than 25 staff, city council members, contractors and media attended the remote dam location.  ](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/4_BBA_Woodworth_Dam_ACEC-BC-_INCLUDE_PHOTO_CREDIT_City-of-Prince-Rupert.jpg)
 
        

  

  

 

 1. - In Numbers
        
         17% Decreased the project budget of nearly 17%
    - 40% Reduced rock anchor quantity by 40% thanks to the innovative 3D printing approach
    - 25% The concrete volume was reduced by 25%
    - 18% Rock excavation volume was recuced by 18%
 
   - [  29 Jul 2026 
    
     Sachin Jari appointed Principal Director &amp; Head of Commercial Strategy and Business Development 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/news/sachin-jari-appointed-principal-director-head-of-commercial-strategy-and-business-development "Sachin Jari appointed Principal Director & Head of Commercial Strategy and Business Development")
- [  27 Jul 2026 Mining and Metals  
    
     
    
     Early tailings decisions shape long-term mine performance 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/early-tailings-decisions-shape-long-term-mine-performance "Early tailings decisions shape long-term mine performance")
- [  02 Jul 2026 Mining and Metals  
    
     
    
     Python: A key tool for data analysis in mineral processing 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/insights/python-a-key-tool-for-data-analysis-in-mineral-processing "Python: A key tool for data analysis in mineral processing")
- [  02 Jul 2026 
    
     Stéphanie Turbide appointed Office Director, Mont-Saint-Hilaire 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/en-ca/news/stephanie-turbide-appointed-office-director-mont-saint-hilaire "Stéphanie Turbide appointed Office Director, Mont-Saint-Hilaire")
 
 

       

 

 

   

 Let’s see what  
we can do  
together [ Contact us    

 ](https://www.bbaconsultants.com/en-ca/contact) 

 

   

 1. ## Our experts' solutions
    
    When revising the initial design, our engineers compared several models using an innovative process: the dams were 3D printed, the riverbeds were CNC routed, and they were all tested in hydraulic flumes to confirm their flow characteristics. Realistic model structures were used to communicate the new design to stakeholders in a visual way. This approach allowed our team to optimize the initial Woodworth Dam design while significantly decreasing the project budget (by nearly 17%).
2. - [  ![BBA_WoodWorthDam_Project](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/_size_squared/132012/5_BBA_WoodWorth_Dam_ACEC-BC.webp) Realistic model structures were used to communicate the new design to stakeholders in a visual and interactive way.  ](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/5_BBA_WoodWorth_Dam_ACEC-BC.jpg)
    - [  ![BBA_WoodWorthDam_3dprinting_Project](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/_size_squared/132042/3_BBA_WoodWorth_Dam_ACEC-BC.webp) The innovative 3D printing approach reduced the concrete, rock anchor volume and excavations.  ](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/3_BBA_WoodWorth_Dam_ACEC-BC.jpg)
3. The new structure, a 15-metre-high concrete gravity dam, was built downstream from the existing dam, in a rocky canyon, and should ensure a stable water supply for the next 50 to 100 years.
    
    Since Prince Rupert is known for its significantly heavy rainfalls, BBA also took care to predict and allow for future changes in flow regimes within the river system as a result of climate change. The spillway capacity was oversized to allow for future flood flows and demands.
    
    Best environmental and dam safety practices were implemented throughout the project to ensure its sustainability.
4. [  ![BBA_WoodWorthDam_Project](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/1_BBA_WoodWorth_Dam_ACEC-BC.jpg) Dam safety best practices: the overall dam was designed to be overtopped entirely during a flood event.  ](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/1_BBA_WoodWorth_Dam_ACEC-BC.jpg)
5. Since the Woodworth Dam is located on First Nations land, the communities were involved throughout the project to ensure that special attention and care was taken to respect the location and their culture.
    
    The completion and commissioning of the Woodworth Dam were celebrated on October 14, 2022. It now allows water to be taken directly from the Woodworth Reservoir and piped by a high-density polyethylene pipeline down and across the harbour, entering the City of Prince Rupert’s water system.
6. - [  ![BBA_Woodworthdam_Cedar_Project](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/_size_squared/132088/20220901_083621.webp) Preservation of a significant First Nations cultural symbol: the ceremonial cedar tree  ](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/20220901_083621.jpg)
    - [  ![BBA_WoodworthDam_Celebratory_Project](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/_size_squared/132105/4_BBA_Woodworth_Dam_ACEC-BC-_INCLUDE_PHOTO_CREDIT_City-of-Prince-Rupert.webp) Oct. 14, 2022 – A celebratory delegation of more than 25 staff, city council members, contractors and media attended the remote dam location.  ](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/4_BBA_Woodworth_Dam_ACEC-BC-_INCLUDE_PHOTO_CREDIT_City-of-Prince-Rupert.jpg)