The new structure, a 15-metre-high concrete gravity dam, was built downstream from the existing dam, in a rocky canyon, and should ensure a stable water supply for the next 50 to 100 years.
Since Prince Rupert is known for its significantly heavy rainfalls, BBA also took care to predict and allow for future changes in flow regimes within the river system as a result of climate change. The spillway capacity was oversized to allow for future flood flows and demands.
Best environmental and dam safety practices were implemented throughout the project to ensure its sustainability.