title: Copper Mountain trolley-assist pre-feasibility study
date: 2024-05-23T15:19:00-04:00
author: jessica napert
canonical_url: "https://www.bbaconsultants.com/es-cl/projects/copper-mountain-trolley-assist-prefeasibility-study"
section: Projects
---
Hudbay operates the Copper Mountain mine, an open-pit copper mine near Princeton, B.C., with annual copper production of around 90 million pounds. In 2020, for each tonne of copper produced, the mine emitted approximately 2.3 tonnes of carbon dioxide equivalent greenhouse gases (GHG). To reduce their carbon intensity and receive funding from the CleanBC fund, as well as support from BC Hydro, Copper Mountain (now Hudbay) wanted to evaluate the feasibility of implementing a trolley-assist system (TAS) on a 1 km haul ramp segment.

 

- Fecha may 09, 2020
- Región Oeste de Canadá
- Cliente  Hudbay Minerals Inc.
 
 

 

 

   1. ## Our experts' solutions
    
    BBA was chosen to perform various PFS-level engineering tasks, such as geotechnical, structural, mining and electrical engineering. We also performed the constructability, estimation and scheduling as well as being the overall study integrator, consolidating work from ABB, Komatsu and Struthers Tech.
    
    Additionally, our experts designed the haul ramp segment to include a dedicated trolley-assist lane and determined the location for the electrical substation. We assessed changes in fuel and electrical consumption, as well as their impact on greenhouse gas emissions. The team evaluated project baseline conditions and structural requirements, analyzing the costs and implications of upgrading the main substation with a new 50 MVA transformer and 20 MVAR STATCOM, along with onsite 25 kV power distribution.
    
    Future benefits could include reduction in planned greenhouse gas emissions—over 90% reduction with TAS implementation on the identified haul ramp segment, compared to diesel-powered haul trucks—plus an overall GHG reduction goal of approximately 6.5% compared to Copper Mountain mine's 2019 emissions.
    
    The project also has a goal to reduce operating costs by replacing diesel power with low-cost hydroelectric power in B.C., along with improved truck-cycle time, enabling the hauling of more ore in a shorter timeframe with TAS implementation.
2. [  ![Bba site visit to copper mountain bc 2022 500 500](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/bba-site-visit-to-copper-mountain-bc-2022-500-500.jpg)  ](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/bba-site-visit-to-copper-mountain-bc-2022-500-500.jpg)
 
   

  

 

    - [  29 jul 2026 
    
     Sachin Jari appointed Principal Director &amp; Head of Commercial Strategy and Business Development 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/news/sachin-jari-appointed-principal-director-head-of-commercial-strategy-and-business-development "Sachin Jari appointed Principal Director & Head of Commercial Strategy and Business Development")
- [  27 jul 2026 Minería y metalurgia  
    
     
    
     Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/las-decisiones-sobre-relaves-definen-desempeno-mina-a-largo-plazo "Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo")
- [  02 jul 2026 Minería y metalurgia  
    
     
    
     Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/python-una-herramienta-clave-para-analisis-datos-en-procesamiento-minerales "Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales")
- [  02 jul 2026 
    
     Stéphanie Turbide appointed Office Director, Mont-Saint-Hilaire 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/news/stephanie-turbide-appointed-office-director-mont-saint-hilaire "Stéphanie Turbide appointed Office Director, Mont-Saint-Hilaire")
 
 

       

 

 

   

 Your BC partner in the field and beyond [ Contact us    

 ](https://www.bba.ca/contact) 

 

   

 1. ## Our experts' solutions
    
    BBA was chosen to perform various PFS-level engineering tasks, such as geotechnical, structural, mining and electrical engineering. We also performed the constructability, estimation and scheduling as well as being the overall study integrator, consolidating work from ABB, Komatsu and Struthers Tech.
    
    Additionally, our experts designed the haul ramp segment to include a dedicated trolley-assist lane and determined the location for the electrical substation. We assessed changes in fuel and electrical consumption, as well as their impact on greenhouse gas emissions. The team evaluated project baseline conditions and structural requirements, analyzing the costs and implications of upgrading the main substation with a new 50 MVA transformer and 20 MVAR STATCOM, along with onsite 25 kV power distribution.
    
    Future benefits could include reduction in planned greenhouse gas emissions—over 90% reduction with TAS implementation on the identified haul ramp segment, compared to diesel-powered haul trucks—plus an overall GHG reduction goal of approximately 6.5% compared to Copper Mountain mine's 2019 emissions.
    
    The project also has a goal to reduce operating costs by replacing diesel power with low-cost hydroelectric power in B.C., along with improved truck-cycle time, enabling the hauling of more ore in a shorter timeframe with TAS implementation.
2. [  ![Bba site visit to copper mountain bc 2022 500 500](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/bba-site-visit-to-copper-mountain-bc-2022-500-500.jpg)  ](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/Projects/bba-site-visit-to-copper-mountain-bc-2022-500-500.jpg)