Insights
-
01 Jun 2026In some projects, the main challenge isn’t technical complexity. It’s the schedule. When schedules become critical, engineering teams need to shift their mindset: make decisions earlier, accept uncertainty and rely on shared performance. As such, engineering becomes a process of making choices, striking compromises and managing risks, both technical and human. Below are three key questions addressed by Hugo Careau, P.Eng., Decarbonization, and Ulric Chayer, P.Eng., Department Manager, Mechanical Engineering.When the schedule is the client’s top priority
-
16 Sep 2021Mining and Metals9 questions to ensure the success of your artificial intelligence projects
-
16 Sep 2021Other IndustriesMigrating a distributed control system (DCS): upgrading the operational infrastructure
-
Diego Quintero, P.Eng.
Senior Engineer, Operational Technology and Infrastructure
-
-
14 Sep 2021Power and RenewablesSuccessfully manage your project using solid communication with stakeholders
-
Marie Chiasson, P.Eng.
Practice Leader, Engineering Management
-
-
14 Sep 2021Power and RenewablesDo you have an incident response plan for your industrial control systems?
-
Pierre Janse Van Rensburg, GCIH
Senior Consulting Expert, ICS Cybersecurity
-
-
11 Aug 2021Power and RenewablesProject managers want to ensure their work complies with Québec’s Environment Quality Act (EQA), but recent changes are making them face major challenges. In fact, the EQA update and the enactment, in December 2020, of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact (REAFIE) have radically changed how activities are supervised subject to ministerial authorization under section 22 of the Act. Remember that the REAFIE classifies proposed activities according to their level of environmental risk. So, under certain conditions, activities may be entitled to a statement of compliance or exempt from an authorization. So, how do you figure it out?Project compliance with environmental laws: Why is the initial approach important? -
11 Aug 2021Power and RenewablesReuse, refurbish or replace? How to select the right option for your plant expansion
-
Catherine Pelletier, P.Eng.
Senior Engineer, Process Mining and Metals
-
-
10 Aug 2021Power and RenewablesHow to avoid production losses in the event of voltage sags on a distribution system
-
-
05 Aug 2021Power and RenewablesIndustry 4.0: augment your reality, regardless the size of your plant!
-
Alexis Lallemand Desmarais
Programmer Analyst, Process Control and Operational Technology
-
-
05 Aug 2021Power and RenewablesIndustry 4.0: the design you expect, thanks to virtual reality
-
Alexis Lallemand Desmarais
Programmer Analyst, Process Control and Operational Technology
-
-
22 Jun 2021Mining and MetalsAn underperforming alarm system reduces operator efficiency, personnel and facility safety, and profitability. Inefficiencies are often caused by incorrect configuration or inappropriate thresholds.Optimize alarm system performance-
Marc Tardif, Technologist
Senior Advisor, Operations - Salt Lake City office
-
-
21 Jun 2021Power and RenewablesCloud computing for industrial performance
-
-
27 May 2021Power and RenewablesEarth observation boosted by artificial intelligence
-
26 May 2021Power and RenewablesPower system voltage levels: making the right choices
-
Stéphan Landry, P.Eng.
Principal Engineer, Electrical - Power Generation and Apparatus
-
-
24 May 2021Mining and MetalsUnderground shaft excavation using the inverse (drop) raise method
-
Félix Roy-Demers P.Eng.
Engineer
-
-
28 Apr 2021Power and RenewablesIt’s a fact: the future of mining is electric. The first step is a big one, and you may be hesitant. Of course, it can be expensive up front and mine ramp-up can be quicker with conventional methods. In this blog article, we’ll explore the steps to optimize your mine’s electrification.The future of electrifying mines in B.C.-
Amanda Fitch, P.Eng.
Director, Mining and Metals
-
-
21 Apr 2021Mining and MetalsMetallurgical lab designed to meet your needs
-
20 Apr 2021Power and RenewablesData science serving business
-
-
13 Apr 2021Mining and MetalsFire and gas detection: avoid the traps!
-
Sébastien Grégoire, P.Eng.
Senior Engineer, Automation
-
-
06 Apr 2021Power and RenewablesFluid-filled transformer refurbishment: points to monitor
-
30 Mar 2021Mining and MetalsIn Canada, there are many mines with iron pellet hardening furnaces (indurating furnaces) that are aging and require upgrading. This type of rehabilitation requires careful planning and rigorous engineering to lower the impact on production and project costs for installations that are usually located in remote locations.Rehabilitating an iron pellet indurating furnace-
Eric Moisan, P.Eng., M.A.Sc.
Department Manager, Industrial and Hydro
-
-
23 Mar 2021Mining and MetalsHow to reduce plant noise levels
-
Nicholas Allen, P.Eng.
Engineer - Energy and Air Quality
-
-
22 Mar 2021Mining and MetalsRisks associated with mining dam failure
-
16 Mar 2021Mining and MetalsManaging your investment plan wisely
-
Claude Catudal
Senior Consulting Expert, Project Management and Control
-
-
03 Mar 2021Power and RenewablesIndustrial control system (ICS) cybersecurity risk methodology webinar
-
José Alvarado, P.Eng., GICSP
Director, ICS Cybersecurity
-
-
02 Mar 2021Mining and MetalsA mining dam safety review is a legislated periodic review. Mining dams are classified according to their potential consequences of failure, which may be experienced in their lifetime. As such, this safety review must be conducted at least every five years for dams that are classified as “significant”, “high”, “very high” or “extreme” under the Mining Act and in accordance with Canadian Dam Association (CDA) guidelines (2007, 2013). Existing regulations in the province where the dam is located must also be taken into account. For example, the Legislated Dam Safety Reviews in BC (2016) published by Engineers and Geoscientists British Columbia (EGBC) provides guidelines of professional practice for engineers who carry out dam safety reviews in British Columbia.Mining dam safety review -
22 Feb 2021Power and RenewablesA piecemeal 4.0 approach? Really?
-
Jean-François Beaulieu
Director, Digital Consultant
-
-
09 Feb 2021Mining and MetalsFlow issues in silos and bins
-
-
08 Feb 2021Power and RenewablesA procedural overview of urban or sensitive-area blasting practices
-
Riccardo Del Bosco, P.Eng.
Senior Engineer, Mining and Geology
-
-
01 Feb 2021Power and RenewablesExcitation system upgrades: make the right choice!
-
Léo Roy, P.Eng.
Senior Engineer, Electrical
-
-
25 Jan 2021Power and RenewablesTechnologies, such as IEC61850, introduce the need for a different engineering approach to electrical protection networks (EPN). Traditional telecommunication networks transporting information, require a new approach in design and architecture capable of responding to these emerging technologies.Design and commissioning of a massive IEC61850 multivendor substation automation project: a twisted path -