-
Patrice Pelletier, P.Eng.
Department Manager, Structural
Insights
-
07 Apr 2022Power and RenewablesCollaborative approach: sensible use of 3D models for steel structures
-
30 Mar 2022Power and RenewablesSuccessfully digitalizing electrical infrastructures
-
28 Feb 2022Power and RenewablesApplication of photogrammetry on rock slope characterization
-
-
21 Feb 2022Power and RenewablesMigrating a distributed control system: modernizing industrial controllers and I/O boards
-
-
14 Feb 2022Power and RenewablesPiles are structural elements in a foundation that have the function of transferring a combination of vertical and horizontal loads from the superstructure through weak soil strata and terminating them onto a competent dense soil or bedrock.Pile design and construction-
Masood Meidani, P.Eng., Ph.D.
Senior Engineer, Civil
-
-
04 Feb 2022Power and RenewablesAdvances in the design of geosynthetic reinforced soil (GRS) retaining walls
-
Cong Xu, Ph.D., EIT
Geotechnical Engineer
-
-
31 Jan 2022Power and RenewablesDigital power systems: an influencing tool in asset management
-
Lyle Neumann, P.L. Eng., C.E.T., S.C.O.
Department Manager, Industrial and Renewable Power
-
-
21 Jan 2022Power and RenewablesManaging ICS cybersecurity incident response: going beyond containment, eradication and recovery
-
Pierre Janse Van Rensburg, GCIH
Senior Consulting Expert, ICS Cybersecurity
-
-
04 Jan 2022Power and RenewablesMetal powder production: quality control is crucial
-
Benoit Desjardins, P.Eng.
Senior Engineer, Operational Readiness and Commissioning
-
-
13 Dec 2021Mining and MetalsNumerous mining-related infrastructures have been built and operated across Canada and the world, and it is a common practice to analyze the stability of their tailings facilities. However, it remains challenging to do so when they are subject to dynamic loads, including earthquakes and blasts. Dynamic stability of tailings dams is commonly evaluated by using the pseudo-static method for low-risk regions. Such a simplified method can provide quick and cost-effective inputs. However, based on limit equilibrium analysis, it tends to oversimplify the dynamic response of tailings prone to liquefaction. In August 2020, following several recent catastrophic failures of tailings dams worldwide (e.g., Mount Polley in Canada, and Fundão and Brumadinho in Brazil), an international standard, Global Industry Standard on Tailings Management (GISTM 2020), was formulated with more stringent seismic design criteria. In this context, BBA offers a more advanced approach, based on stress-strain (i.e., deformation) analysis, to specifically address stability problems for tailings storage facilities (TSF) that are subject to dynamic loads.Stress-strain analysis of tailings facilities subject to dynamic loads -
-
07 Dec 2021Mining and MetalsChallenges to open pit mining through historic underground workings
-
John Henning, P.Eng., Ph.D.
Principal Engineer, Mining and Geology
-
-
02 Dec 2021Power and RenewablesMetal powder production: OHS risks first!
-
Benoit Desjardins, P.Eng.
Senior Engineer, Operational Readiness and Commissioning
-
-
30 Nov 2021Power and RenewablesThe importance of mechanical BoP systems
-
Hugo Careau, P.Eng.
Principal Engineer, Decarbonization
-
-
26 Nov 2021Power and RenewablesCommon pitfalls when mapping a process
-
20 Oct 2021Mining and MetalsSome industrial projects involve a plant process that uses vibrating screens. In mining, for example, such apparatuses, also called sieves or sifters, are used to separate solid or crushed ore and are appropriate for wet or dry applications. They are designed to separate materials by allowing some particles to pass through the screen according to their size using a combination of movements caused by a vibrating motor. The movements or vibrations are transmitted to the structural supports, which could be a foundation or steel structure.Designing structures to support suspended vibrating screens -
-
16 Sept 2021Mining and Metals9 questions to ensure the success of your artificial intelligence projects
-
14 Sept 2021Power and RenewablesSuccessfully manage your project using solid communication with stakeholders
-
Marie Chiasson, P.Eng.
Practice Leader, Engineering Management
-
-
11 Aug 2021Power and RenewablesProject compliance with environmental laws: Why is the initial approach important?
-
11 Aug 2021Power and RenewablesReuse, refurbish or replace? How to select the right option for your plant expansion
-
Catherine Pelletier, P.Eng.
Senior Engineer, Process Mining and Metals
-
-
05 Aug 2021Power and RenewablesIn the wake of the fourth industrial revolution, businesses want to perform their digital transformation under optimal conditions.Industry 4.0: augment your reality, regardless the size of your plant!-
Alexis Lallemand Desmarais
Programmer Analyst, Process Control and Operational Technology
-
-
05 Aug 2021Power and RenewablesIndustry 4.0: the design you expect, thanks to virtual reality
-
Alexis Lallemand Desmarais
Programmer Analyst, Process Control and Operational Technology
-
-
22 Jun 2021Mining and MetalsOptimize alarm system performance
-
Marc Tardif, Technologist
Senior Advisor, Operations - Salt Lake City office
-
-
21 Jun 2021Power and RenewablesCloud computing for industrial performance
-
-
27 May 2021Power and RenewablesEarth observation boosted by artificial intelligence
-
24 May 2021Mining and MetalsThe construction and development of large infrastructure such as hydroelectric dam installations, underground mine site accesses, ventilation shafts or raises, can be undertaken using various rock excavation techniques.Underground shaft excavation using the inverse (drop) raise method-
Félix Roy-Demers P.Eng.
Engineer
-
-
28 Apr 2021Power and RenewablesThe future of electrifying mines in B.C.
-
Amanda Fitch, P.Eng.
Director, Mining and Metals
-
-
21 Apr 2021Mining and MetalsMetallurgical lab designed to meet your needs
-
20 Apr 2021Power and RenewablesData science serving business
-
-
13 Apr 2021Mining and MetalsFire and gas detection: avoid the traps!
-
Sébastien Grégoire, P.Eng.
Senior Engineer, Automation
-
-
30 Mar 2021Mining and MetalsIn Canada, there are many mines with iron pellet hardening furnaces (indurating furnaces) that are aging and require upgrading. This type of rehabilitation requires careful planning and rigorous engineering to lower the impact on production and project costs for installations that are usually located in remote locations.Rehabilitating an iron pellet indurating furnace-
Eric Moisan, P.Eng., M.A.Sc.
Department Manager, Industrial and Hydro
-