-
Marie-Claire LeBlanc,
Environmental Professional
Insights
-
04 Mar 2026All industriesRestoring together: a comprehensive approach to wetland and waterbody planning
-
03 Oct 2019Power and RenewablesDemystify the integration of new technologies
-
Marc-André Perron, P.Eng.
Director, Management - Digital Power Systems
-
-
01 Oct 2019Power and RenewablesHydro generators: introduction to stator windings
-
François St-Germain, P.Eng.
Principal Engineer, Industrial and Hydro
-
-
23 Sept 2019Other IndustriesSave time and money when integrating your new systems
-
Mario Côté, P.Eng.
Senior Engineer, Automation
-
-
16 Sept 2019Power and RenewablesAlarm rationalization: a guide for quick wins!
-
Maxym Lachance, P.Eng.
Senior Engineer, Process Control and Operational Technology
-
-
04 Sept 2019Power and RenewablesMedium and high-voltage electrical equipment found in substations and industrial facilities need DC power in order to provide uninterrupted power to emergency systems, to protection devices and, in some cases, to computer systems and programmable logic controllers (PLCs). If a power outage occurs, batteries can reliably supply uninterrupted DC power that is independent of your AC power system.Stationary batteries: Will yours work when you need them?-
Dominic Dubreuil, P.Eng.
Electrical Engineer
-
-
04 Sept 2019Power and RenewablesThe challenges of integrating renewable energy sources into off-grid power systems
-
Stéphan Landry, P.Eng.
Principal Engineer, Electrical - Power Generation and Apparatus
-
-
15 Aug 2019Power and RenewablesIntegrating a renewable energy source into mining: six key steps
-
Jean-Philippe Castonguay, P.Eng.
Director - Off-Grid Hybrid Power & Energy Storage
-
-
09 Aug 2019Power and RenewablesSupporting indigenous communities with environmental management plans
-
Vincent Clément, P.Biol., RP.Bio., QAES
Senior Environmental Professional
-
-
05 Aug 2019Power and RenewablesDo you need advanced control?
-
Michel Ruel, P.Eng.
Expert, Process Control
-
-
22 Jul 2019Mining and MetalsSlurry pumping and transportation is a complex process that requires specialized knowledge, comprehensive testwork and collaboration with third parties, such as pump suppliers. Here is an overview of the important components to consider when sizing systems and selecting equipment.Slurry engineering: what to consider-
Roman Dorfman, P.Eng.
Principal Engineer, Piping
-
-
05 Jul 2019Power and RenewablesPromoting environmental and social compliance of your projects
-
Vincent Clément, P.Biol., RP.Bio., QAES
Senior Environmental Professional
-
-
03 Jul 2019Power and RenewablesDigital Power Systems and Grid Modernization
-
-
02 Jul 2019Mining and MetalsStructural expertise in ore loading pockets
-
-
27 Jun 2019Energy and Chemical ProcessesProven methods for reducing sulfur dioxide (SO2) emissions
-
Joe Nava, P.Eng.
Global Director, Advanced Fuels and Chemicals
-
-
14 Jun 2019Power and RenewablesOne of the biggest challenges to tackle when adopting and integrating new digital technology is knowing where to start. There are so many buzzwords, concepts and technologies when it comes to Industry 4.0 that you need to take a step back when selecting the best solutions for your business.Integrating digital technology: Ready, set, go!-
Marc-André Perron, P.Eng.
Director, Management - Digital Power Systems
-
-
13 Jun 2019Power and RenewablesNERC regulatory compliance program: where to start
-
Éric Breault, P.Eng.
Senior Engineer, Electrical - Power Systems, Protection and Control
-
-
11 Jun 2019Power and RenewablesEngineers’ responsibilities: Which version of the National Building Code should be used?
-
Bertrand Comeau, P.Eng.
Principal Engineer, Structural
-
-
05 Jun 2019Other IndustriesSuccessfully integrate your new systems!
-
Mario Côté, P.Eng.
Senior Engineer, Automation
-
-
23 May 2019Power and RenewablesIEEE 1584-2018 guide for performing arc-flash hazard calculations: comparative analysis with IEEE 1584-2002
-
Joel Sourceaux, P.Eng.
Principal Engineer, Electrical - Power Systems, Protection and Control
-
-
17 May 2019Power and RenewablesMake your operational data talk -
-
17 May 2019Power and RenewablesThe cyber risks of introducing new technologies into your operations
-
José Alvarado, P.Eng., GICSP
Director, ICS Cybersecurity
-
-
16 May 2019Power and RenewablesHydraulic simulation with 3D computational fluid dynamic modelling in a flood event
-
Glen Ichikawa, P.Eng.
Senior Engineer - Hydropower
-
-
15 May 2019Power and RenewablesCut your commissioning time with process control
-
Marc Tardif, Technologist
Senior Advisor, Operations - Salt Lake City office
-
-
25 Apr 2019Power and RenewablesControl risks of explosion in your plant
-
Hugues Châteauneuf, P.Eng.
Senior Consulting Expert, Ventilation, Hazardous Locations, Explosion Hazards
-
-
22 Apr 2019Mining and MetalsGovernment representatives can ask to conduct a plant inspection—a request that may worry facility owners. This article discusses air quality management and will inform you on how inspections are carried out and what you can do to ensure your facilities comply with government air quality standards. A number of things can prompt the Ministère de l’Environnement et de la Lutte contre les changements climatiques (MELCC) to undertake a plant inspection, including citizen complaints. Close to 70% of complaints from the public have to do with problems about odours or dust.What to do during an inspection by the Ministère de l'environnement-
David Giard, P.Eng., M.Sc.
Senior Engineer, Environmental Engineering
-
-
19 Apr 2019Power and RenewablesCorona: a problem you should not ignore
-
Samuel Gendron, P.Eng.
Senior Engineer, Field Services
-
-
11 Apr 2019Power and RenewablesManaging power system harmonics for underground mines
-
Stéphan Landry, P.Eng.
Principal Engineer, Electrical - Power Generation and Apparatus
-
-
08 Apr 2019Power and RenewablesWT steel: When should you use it?
-
Monika Rybarova, P.Eng., M.A.Sc., P.M.P.
Principal Engineer, Structural
-
-
08 Apr 2019Power and RenewablesOptimize conception with constructability
-
Vincent Hudon, P.Eng.
Department Manager, Construction
-
-
02 Apr 2019Power and RenewablesWhen a project moves from the study phase to the execution phase, the client’s project team often focuses on choosing the engineering firm and planning construction work. At this stage, commissioning seems to be no more than a distant milestone in the project schedule. As a result, the project team does not consider it an urgent matter for discussion, because so many other priorities are jostling for their attention at this time. During the execution phase, if the client does have an operational readiness team, it is a small one. This makes it difficult to get the client to take an interest in operational readiness activities and commissioning of its project. And yet there are benefits in addressing this subject as soon as project execution begins, and even at the study phase.Operational readiness and commissioning plans: the key to a successful start-
Sylvain Boily, P.Eng., M.B.A., P.M.P.
Commissioning Manager, Operational Readiness and Commissioning
-