Strategic restart of the Troilus Mine

  • Project
Mm project troilus gold corp strategic restart of the troilus mine web SQ LR BBA

  • Region Eastern Canada
  • Client Troilus Gold Corp.
  1. Poised to become one of Canada’s largest gold-copper producers, the Troilus project builds on solid mineral resources, existing infrastructure and a vision focused on responsible mining. Backed by a feasibility study aligned with NI 43-101 regulations and published in 2024, the project is targeting an average annual production of 244,600 ounces of gold, 17.3 million pounds of copper and 446,700 ounces of silver over its 22-year mine life. A construction decision is expected in 2026.

    BBA’s contribution to the project

    • Key milestone reached: main flowsheet confirmed (updated: June 2025)
    • Basic and detailed engineering, advancing progress toward construction
    • Integrated technical deliverables, driven by a structured and rigorous approach
    • Mobilization to realize a robust, scalable and energy-efficient vision
    • In-depth site knowledge and a proven track record from major redevelopment projects such as Canadian Malartic and Detour Lake.

    Strategic impact

    “Strong collaboration between BBA and our team allowed us to finalize the flowsheet on schedule—a major milestone that reflects the precision and discipline guiding our development.”

    — Justin Reid, CEO, Troilus Gold Corp.