BBA’s contribution to the project
- Pre-development support, including conceptual designs and revenue forecasting
- Development, permitting and approvals support, from early-stage feasibility through to detailed engineering execution
- High-voltage and utility interconnection engineering, including IESO approvals and substation design
- 500 kV brownfield interconnection, including switching station modifications and overhead lines
- Civil site infrastructure and constructability coordination
- 500 kV substation detailed design, including AIS structures and protection & control
- Telecom, controls and automation systems integration, including SCADA
- SCADA/DCS programming and power plant controller interfaces
- Integrated fire protection, resiliency and operational safety strategies
Strategic impact
“Delivering this project ahead of schedule and on budget reflects our project team’s skill and dedication, including our joint venture partner, Ameresco Canada, and the many trades and engineering professionals who made it possible.”
-Tom Patterson, President and CEO, Atura Power