1. Waste Rock Piles can measure hundreds of meters in height and their failure can put life and property at extreme risk as well as significantly impact the surrounding environment. As such, waste rock piles should be considered structures, rather than dumps. Waste rock piles geometry and height is site-specific and govern the level of risk associated to its construction, operation and management. However, the design of these structures does not always garner the rigorous attention that they should be afforded. This paper provides practical nomograms for designing waste rock piles on solid competent foundations. In cohesionless soils, commonly placed using end-dumping methods, the stability of the stockpile slope depends on the angle of internal friction (Ø), slope angle and the height, for a given depth of critical slip failure. The nomograms presented herein are based on the requirement of attaining an overall factor of safety of 1.5 and a local factor of safety of 1.2.
    
    Note that this white paper was the subject of a presentation at the Tailings and Mine Waste’18 Conference in Colorado State University.
 
This content is for general information purposes only. All rights reserved ©BBA

 

    1. ![Luciano Piciacchia](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/3206/Luciano-Piciacchia.webp)   
    
     Luciano Piciacchia, P.Eng., Ph.D.
    
    Senior Consulting Expert, Earth and Infrastructure
    
         [  ](https://www.linkedin.com/in/lucianopiciacchia/)
2. ![Vahid Marefat](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/3194/Vahid-Marefat.webp)   
    
     Vahid Marefat, P.Eng., Ph.D.
    
    Senior Engineer, Earth and Infrastructure
    
         [  ](https://www.linkedin.com/in/vahidmarefat/)
 
 

       

  

  

 

     - [  27 jul 2026 Minería y metalurgia  
    
     
    
     Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/las-decisiones-sobre-relaves-definen-desempeno-mina-a-largo-plazo "Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo")
- [  02 jul 2026 Minería y metalurgia  
    
     
    
     Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/python-una-herramienta-clave-para-analisis-datos-en-procesamiento-minerales "Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales")
- [  19 jun 2026 Minería y metalurgia  
    
     
    
     Speed is earned early in projects 
    
     
    
     
    
    
    - ![Mm employee men jean lheureux retouch web SQ LR BBA](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/204266/mm_employee_men_jean-lheureux_retouch_web_SQ_LR_BBA.webp)
    - ![Mm employee men benoit richard retouch web SQ LR BBA](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/203602/mm_employee_men_benoit-richard_retouch_web_SQ_LR_BBA.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/speed-is-earned-early-in-projects "Speed is earned early in projects")
- [  17 jun 2026 
    
     Industrial data platforms: building a solid foundation to optimize your operations 
    
     
    
     
    
    
    - ![Pierre Boucher](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/2671/Pierre-Boucher.webp)   
        
         Pierre Boucher, P.Eng.
        
        Senior Engineer, Operational Technology and Infrastructure
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/industrial-data-platforms-building-a-solid-foundation-to-optimize-your-operations "Industrial data platforms: building a solid foundation to optimize your operations")
 
 

       

 

 [ Ver todo 

 ](https://www.bbaconsultants.com/es-cl/perspectivas "Ir a la página del listado de Publications") 

 

   

 Pensemos  
más [ Póngase en contacto con nosotros    

 ](https://www.bbaconsultants.com/es-cl/p%C3%B3ngase-en-contacto-con-nosotros) 

 

   

 1. Waste Rock Piles can measure hundreds of meters in height and their failure can put life and property at extreme risk as well as significantly impact the surrounding environment. As such, waste rock piles should be considered structures, rather than dumps. Waste rock piles geometry and height is site-specific and govern the level of risk associated to its construction, operation and management. However, the design of these structures does not always garner the rigorous attention that they should be afforded. This paper provides practical nomograms for designing waste rock piles on solid competent foundations. In cohesionless soils, commonly placed using end-dumping methods, the stability of the stockpile slope depends on the angle of internal friction (Ø), slope angle and the height, for a given depth of critical slip failure. The nomograms presented herein are based on the requirement of attaining an overall factor of safety of 1.5 and a local factor of safety of 1.2.
    
    Note that this white paper was the subject of a presentation at the Tailings and Mine Waste’18 Conference in Colorado State University.
 
This content is for general information purposes only. All rights reserved ©BBA