Grise Fiord is located 1,140 km north of the Arctic Circle. The community is difficult to access and is home to about 130 inhabitants. It is the northernmost inhabited region of the country with some of the coldest temperatures in the world. The project began when Qulliq Energy Corporation (QEC) started replacing its aging diesel facility with a new, more efficient 900 kW power plant, including 4,160 V for the community. The project involved significant design constraints and needed to be carried out under a very tight deadline because of the harsh climate and a very short navigation season.

 Premios y reconocimientos- 2018 Award of Excellence in Steel Construction - CISC-ICCA Québec
 
 

- Región Norte de Canadá
- Cliente  EBC for Qulliq Energy Corporation (QEC)
- [ Caso práctico    
    
     ](https://www.assets.bbaconsultants.com/bba-production-assets/production/documents/pdf/BBA_Case-Study_Grise_Fiord_Powerplant_EN_2022-11-07-154915_upkq.pdf "Descargar el PDF de nuestro caso práctico")
 
 

 

 

   1. ## Our experts' solutions
    
    BBA was chosen by EBC to provide its expertise in design, construction support, commissioning and start-up for the modular plant. The implemented solutions were:
    
    
    - Design of a power plant in seven modules that were pre-assembled and tested at the factory, substantially reducing construction costs.
    - The use of 3D modelling during design to resolve design issues upstream
    - The design of a structure made entirely of steel to make it easier to move (structure, pilings, floor, walls, studs, interior and exterior finishing, etc.)
    - Integration of the IEC 61850 communication protocol across all control components also enabled cutting-edge, low-cost construction.
    - Design of all the new facility’s systems, including interconnection of the distribution network and grounding in permafrost conditions.
    - Plant endurance tests, disassembly, packaging, transport, unloading and installation on steel pilings.
    - Perform all electrical studies: arc flash, protection, power flow, surge voltage.
 
        

  

  

 

 1. > We adapted our construction approach based on the extreme cold and the site’s limited access. We decided to assemble the modules and perform the pre-operational testing at the factory to reduce the work duration in the Far North.
    
     Mario Gignac, Department Manager, Civil and Structural, BBA
2. - 900 kW electrical power plant
    - 4,160 V distributed to the local community
    - 1,140 km Located 1,140 km north of the Arctic Circle
 
   - [  29 jul 2026 
    
     Sachin Jari appointed Principal Director &amp; Head of Commercial Strategy and Business Development 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/news/sachin-jari-appointed-principal-director-head-of-commercial-strategy-and-business-development "Sachin Jari appointed Principal Director & Head of Commercial Strategy and Business Development")
- [  27 jul 2026 Minería y metalurgia  
    
     
    
     Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo 
    
     
    
     
    
    
    - ![Geraldine Cosset](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/206707/Geraldine-Cosset.webp)
    - ![Jared Purdy](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/212424/Jared-Purdy.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/las-decisiones-sobre-relaves-definen-desempeno-mina-a-largo-plazo "Por qué las decisiones tempranas sobre relaves definen el desempeño de la mina a largo plazo")
- [  02 jul 2026 Minería y metalurgia  
    
     
    
     Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales 
    
     
    
     
    
    
    - ![Charles Blais](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211197/Charles-Blais.webp)
    - ![Juan Pablo Vergara](https://www.assets.bbaconsultants.com/bba-production-assets/production/images/avatars/_size_avatar/211266/Juan-Pablo-Vergara.webp)
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/perspectivas/python-una-herramienta-clave-para-analisis-datos-en-procesamiento-minerales "Python: Una herramienta clave para el análisis de datos en el procesamiento de minerales")
- [  02 jul 2026 
    
     Stéphanie Turbide appointed Office Director, Mont-Saint-Hilaire 
    
     
    
     
    
     
       
    
     
    
      ](https://www.bbaconsultants.com/es-cl/news/stephanie-turbide-appointed-office-director-mont-saint-hilaire "Stéphanie Turbide appointed Office Director, Mont-Saint-Hilaire")
 
 

       

 

 

   

 Veamos lo  
que podemos  
hacer juntos [ Póngase en contacto con nosotros    

 ](https://www.bbaconsultants.com/es-cl/p%C3%B3ngase-en-contacto-con-nosotros) 

 

   

 1. ## Our experts' solutions
    
    BBA was chosen by EBC to provide its expertise in design, construction support, commissioning and start-up for the modular plant. The implemented solutions were:
    
    
    - Design of a power plant in seven modules that were pre-assembled and tested at the factory, substantially reducing construction costs.
    - The use of 3D modelling during design to resolve design issues upstream
    - The design of a structure made entirely of steel to make it easier to move (structure, pilings, floor, walls, studs, interior and exterior finishing, etc.)
    - Integration of the IEC 61850 communication protocol across all control components also enabled cutting-edge, low-cost construction.
    - Design of all the new facility’s systems, including interconnection of the distribution network and grounding in permafrost conditions.
    - Plant endurance tests, disassembly, packaging, transport, unloading and installation on steel pilings.
    - Perform all electrical studies: arc flash, protection, power flow, surge voltage.